background image

22

Installation and Safety Manual

Trinasmart

To check the local network for issues:

1.

  

Check with the network administrator to make sure the network provides the IP address automatically to computers 
that connect to it. The MMU is configured to obtain an IP address from the network automatically through a DHCP 
server. If the network requires a static IP address see section below.

2.

  

Check if the network cable is functional. If the cable is working and the MMU is connected to an active network switch 

through the cable, the LED should blink at the switch port connection. 

3.

  

Check the network connection with a laptop computer. Verify the network connection to the MMU by disconnecting 
the network cable from the MMU and connecting it to a laptop. If the laptop can access the web but the MMU cannot, 
contact the Tigo Energy support hotline.

Setting up a Static IP address

1.

  

Contact the network administrator and obtain the following information:

Static IP address assigned to the MMU: ........................................................................................................................................................................................
Subnet Mask: .................................................................................................................................................................................................................................................
Default gateway: ........................................................................................................................................................................................................................................
Preferred DNS server: ...............................................................................................................................................................................................................................
Alternate DNS server: ...............................................................................................................................................................................................................................

2.

  

Bring this information and locate the Trinasmart Management Unit. Depress the latch to open the clear protective cover 

on the MMU and press the “MENU” button – then press “ENTER”. Scroll to “3. Network” – then press “ENTER”. Scroll to “3.3. 
CONFIGURE”- then press “ENTER”.

3.

  

The display will read “ARE YOU SURE?” AND “Y=ENTER, N=MENU”. To proceed press “ENTER”. The display will read 

“AUTOMATIC IP?” AND “Y=ENTER, N=MENU”. To proceed press “MENU”. Then the display will read “IP ADDRESS:” AND 
“000.000.000.000”. Notice the cursor is under the left most zero. Use the scroll up and down keys to change the value of 
the number. Use the “ENTER” key to move right and the “MENU” key to move left. When the cursor is on the right most 
digit, you can move to the next input screen by pressing “ENTER”.

4.

  

The next entry field will read “SUBNET MASK” AND AGAIN “000.000.000.000”. Use the four keys as before to move and 
change the number values.

5.

  

The next entry field will read “DEFAULT GATEWAY” AND AGAIN “000.000.000.000”. Use the four keys as before to move 
and change the number values.

6.

  

The next entry field will read “PREFERRED DNS SERVER” AND AGAIN “000.000.000.000”. Use the four keys as before to 
move and change the number values.

7.

  

The next entry field will read “ALTERNATE DNS SERVER” AND AGAIN “000.000.000.000”. Use the four keys as before to 
move and change the number values.

8.

  

The final field will read “SAVE SETTING?” and “Y=ENTER, N=MENU”. Press “ENTER” to complete the entry of a new static IP 

address for the MMU.

Troubleshooting – Optimizer ID

If there is an error with the Optimizer IDs, these can be edited directly through the software interface. From “My 
Installations”, click on the project you would like to edit. Then select the “Admin” tab, and the “Site Details” sub-tab. Scroll to 
the bottom of this page to find a button labeled “Edit Configuration.” From the edit section, hit “Next” twice. You will now 
find yourself on the Optimizer ID page, where you can edit the incorrect IDs. When you are done, click “Save” to save your 
changes.

Troubleshooting modules which are not seen by the Trinasmart Management Unit.

If the Trinasmart MaxiManager Software in the “Summary” view shows the module as powered off, when it is expected to 
be active:
1.

  

Check that the physical connections between the PV module and the Module Optimizer are complete and secure.

2.

  

Refresh the web browser configuration and check to see whether the panel has refreshed.

3.

  

If the problem persists, determine if the Module Optimizer is out of communication range of the MMU. This can be 
determined by the performance of other Module Optimizers in close proximity.

4.

  

If the signal strength is too low, install or reposition the Gateway.

5.

  

Once complete, refresh the browser to check whether the module is now visible and active.

Содержание Trinasmart

Страница 1: ...Installation and Safety Manual TSM_Trinasmart_Installation and Safety Manual_2012_RevB...

Страница 2: ...2 Installation and Safety Manual Trinasmart 3simple steps 1 Configure the System Before Going to the Site 2 Install the Management Unit and Gateway 3 Install the Optimizers and verify system...

Страница 3: ...ng the Management Unit and Gateway 15 Verifying the System 17 Troubleshooting 23 Technical Specifications 25 per UL 1741 This symbol is used to indicate WARNING Failure to follow instructions may resu...

Страница 4: ...PV module with or without the Trinasmart Optimizer attached Installation must be performed by trained professionals only Trina Solar does not assume liability for loss or damage resulting from imprope...

Страница 5: ...nal management and performance monitoring In well designed large scale systems Trinasmart Optimizer systems will return up to 8 incremental power output while in residential or commercial systems with...

Страница 6: ...the MMU will display PVSAFE PRESSED and Requesting to indicate the command has been sent to the Optimizers As the Optimizers are responding the MMU display will indicate how many have successfully dis...

Страница 7: ...user ID password information if already established Installation schematic drawing Phillips and slotted screwdrivers MC4 type connectors 1 male 1 female per string Permanent marker or label maker Dete...

Страница 8: ...8 Installation and Safety Manual Trinasmart IDENTIFYING PARTS OF THE TRINASMART OPTIMIZER SYSTEM Trinasmart Module Optimizer MM ES Gateway Management Unit MMU and Gateway cable...

Страница 9: ...the Mac IDs from the Optimizers ready before beginning the configuration process Optimizer codes can be found on the outside of the box this is not recommended if box has been opened All identificati...

Страница 10: ...wisted pair outdoor rated wire of at least 18AWG See Tigo Energy s website for a list of tested cable options Access the MMU communications ports by pressing the latch at the bottom edge of the clear...

Страница 11: ...ight four pin connector in order to wire the outbound RS 485 cable to the next Gateway Only the final Gateway in the series connection should have a termination resistor When finished replace the cove...

Страница 12: ...cuit do not use a separate or dedicated power supply DO NOT INITIATE DISCOVERY AND POWER ON UNTIL ALL OPTIMIZERS HAVE BEEN INSTALLED NOTE To verify if a connection has been made to the network the ins...

Страница 13: ...ub Array 1 Sub Array 2 Sub Array 4 Sub Array 3 Gateway Gateway Terminated Gateway Position the Gateway at the center of the module cluster and attach to the upper left hand corner of a PV module frame...

Страница 14: ...the modules from the Management Unit console Place this label in a visible location on the front surface of the Fuse Combiner Box typically found adjacent to the array in multi string projects AC Disc...

Страница 15: ...modules return to the Management Unit and initiate the Discovery and Power On command which will also power on the Optimizers if they not powered on already Access this from the MMU display by selecti...

Страница 16: ...communicate effectively with the Gateway By paying close attention to these warning messages the installer can locate the most ideal place for the Gateway to be able to communicate effectively with al...

Страница 17: ...andard PV array Refer to the Troubleshooting section for instructions on verifying the system communication is operating properly Please ensure safety precautions are always observed in order to avoid...

Страница 18: ...off 3 Push Data Immediately attempts to make another communication to transfer data to the data center without having to wait the usual 10 minute period between communications Useful for real time deb...

Страница 19: ...ion can be wired with Cat 5 Ethernet wire The data feed leads A and B on the MMU and Gateway terminal blocks must be connected to the same twisted pair See the table for instructions on connecting the...

Страница 20: ...e Gateway This is useful for troubleshooting problems with the system communications See the table below for the meaning of each light pattern Color pattern Gateway Status No color Not powered from MM...

Страница 21: ...ccess the web via HTTPS proxy and server is not cooperating Verify proxy settings on MMU Verify proxy server allows access to https datacenter tigoenergy com Re initiate network test No default GW Mis...

Страница 22: ...ressing ENTER 4 The next entry field will read SUBNET MASK AND AGAIN 000 000 000 000 Use the four keys as before to move and change the number values 5 The next entry field will read DEFAULT GATEWAY A...

Страница 23: ...d if not installed and used in accordance with the instructions may cause harmful interference to radio communications However there is no guarantee that interference will not occur in a particular in...

Страница 24: ...nt of ISC 0 053 C Input data MMJ ES50 Maximum Power 300W Maximum Input DC Voltage VOC 52V VMP Range 16 48V Maximum Continuous Current IMP 9 5A Maximum Input Current ISC 10A VMP Voltage at maximum powe...

Страница 25: ...ie Street Sydney NSW 2000 t 61 2 8667 3088 f 61 2 8667 3200 e australia trinasolar com United Arab Emirates Trina Solar Middle East Ltd Office 306 Injazat Building Mohamed Bin Zayed City Abu Dhabi P O...

Отзывы: