ERECTING THE AWNING
1 -
Once your caravan is correctly positioned,
carefully clean the ground whilst erecting the
awning in order to avoid any risk of damage.
The doors and windows of the caravan must
be closed.
2 - Place the awning beading on the awning close
to the caravan channel. Insert it in the channel
and slide it until the awning is in the correct
position (A).
3 - Take the pump and connect it to the inflation
valves.
4 - Begin inflation following the instructions given
in the section PUMP and INFLATION of this
booklet.
Begin by inflating the pole located closest to the
front of the caravan and then inflate the other
poles one after another.
ATTENTION
:
During the inflation process the pole
will need to be manually held to ensure it takes its
rounded form.
To do this, pull the guy ropes located in the roun-
ded section of the pole towards you (B).
Do not continue inflating if the pole does not take
its rounded form.
ATTENTION
:
INFLATE EACH POLE TO: 0.344
BARS / 5 PSI. DO NOT INFLATE ABOVE THESE
VALUES AS THIS MAY RESULT IN THE POLES
BURSTING.
A
B
ENGLISH
- 16 -
- 17 -
4 extra tubes
for model Panoramic 300
6 extra tubes for model
Panoramic 410
Notice PANORAMIC 300 ET 410.indd 16
06/02/2018 16:34
Содержание Auvents Panoramic 300
Страница 10: ... 10 FRANÇAIS NOTIZEN Notice PANORAMIC 300 ET 410 indd 10 06 02 2018 16 34 ...
Страница 20: ... 20 ENGLISH B NOTIZEN Notice PANORAMIC 300 ET 410 indd 20 06 02 2018 16 34 ...
Страница 31: ...NOTIZEN 31 DEUTSCH Notice PANORAMIC 300 ET 410 indd 31 06 02 2018 16 34 ...
Страница 32: ...NOTIZEN 32 DEUTSCH Notice PANORAMIC 300 ET 410 indd 32 06 02 2018 16 34 ...