- 36 -
CGS-2 764 C
6
f
inal
proCedures
After installing the head-end station, upgrading accessories or installing mod-
ules it is necessary to tighten all cable connections, cable terminals and cover
screws in order to maintain compliance with current EMC regulations.
• Securely tighten the cable connections using an appropriate open-ended
spanner.
• After programming, connect the modulator output
E
to one of the input
sockets
G
of the output collector (page 11, fig. 4).
• Test the output level of the output collector according to the CSE 2800 as-
sembly instructions and set the output level required for the cable system.
• Mount the base plate and the front cover (see CSE 2800 assembly instruc-
tions).