
Greenflame Wood Pellet Boiler 13-18kW
9
Only authorised T R Engineering Ltd personnel may
open the control panel on the boiler. Any
interference with the wiring in the control panel
will invalidate the warranty. The boiler and
complete plumbing system must be adequately
earthed an bonded in accordance with local
building regulations and Bye-Laws.
4.4 Boiler Control Panel Schematic
Only authorised T R Engineering Ltd personnel may open the control board.
Any tampering with the PCB will immediately invalidate the warranty.