Trianco Greenflame 13kW Скачать руководство пользователя страница 1

Greenflame Wood Pellet Boiler 13-18kW 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Greenflame Slim Wood Pellet Boiler 

13-18kW 

Installation, Operation and Servicing Instructions 

Please read these instructions carefully before installing and 

operating this appliance 

TO BE RETAINED BY HOUSEHOLDER 

Содержание Greenflame 13kW

Страница 1: ...iler 13 18kW 1 Greenflame Slim Wood Pellet Boiler 13 18kW Installation Operation and Servicing Instructions Please read these instructions carefully before installing and operating this appliance TO B...

Страница 2: ...siderations 5 3 1 Pellets 5 3 2 Considerations for Installation 6 3 3 Operating Area 6 3 4 Connection to the Flue 7 3 5 Operating Problems Caused by Draught Defects in the Flue 7 3 6 Plumbing Connecti...

Страница 3: ...and understood the entire contents of this instruction booklet All responsibility for improper use is taken entirely by the user and such use relieves T R Engineering Ltd of any civil or criminal res...

Страница 4: ...led instructions given in the instruction booklet supplied with the product The term guarantee is to be understood to denote the free of charge replacement or repair of parts recognised to have been d...

Страница 5: ...authority is responsible for implementing the Clean Air Act 1993 including designation and supervision 3 Pre Installation Considerations 3 1 Pellets Wood pellets are manufactured by hot extruding comp...

Страница 6: ...sponsibility for the product T R Engineering Ltd domestic pellet appliances run exclusively on pellets with a diameter of 6mm It is recommended that the brand of pellets used during commissioning are...

Страница 7: ...pe is important The Greenflame air flow regulation system is equipped to deal with the conditions referenced above by regulating the air flow through the combustion chamber An air flow sensor is mount...

Страница 8: ...so the unit shall have a 30mA RCD installed into the mains supply It is recommended that a power isolation switch is located adjacent to the boiler to isolate the power during servicing and maintenanc...

Страница 9: ...n the control panel will invalidate the warranty The boiler and complete plumbing system must be adequately earthed an bonded in accordance with local building regulations and Bye Laws 4 4 Boiler Cont...

Страница 10: ...heating system The pump is on the return pipe work just before the boiler It is recommended that a by pass pipe between the flow and return is used with a valve to regulate the temperature of the wate...

Страница 11: ...mpty any un burnt pellet from the burner pot and hold button B for 3 seconds Turn off the time clock for 10 seconds before switching on again Er18 Lack of pellet When the pellets reach the pellet sens...

Страница 12: ...open the main combustion chamber door that the boiler has been switched off and has been allowed to cool down sufficiently so as to not cause injury Always empty ash into a metal container as ash whi...

Страница 13: ...rolonged periods as rain or moisture can affect the pellet Always supervise children when the hopper lid is open in case foreign material is placed into the hopper or children climb into the hopper 7...

Страница 14: ...Greenflame Wood Pellet Boiler 13 18kW 14 1100mm 495mm 1150mm Flue Height Determined on Site...

Страница 15: ...vided Service Engineer Date Service Provided Service Engineer Date Service Provided Service Engineer Date Service Provided Service Engineer Date Service Provided Service Engineer Date Service Provided...

Страница 16: ...ianco co uk Web www trianco co uk T R Engineering Ltd Copyright in this brochure and the drawings and illustrations contained in it is vested in T R Engineering Ltd and neither the brochure or any par...

Отзывы: