Trianco AZTEC 12 Скачать руководство пользователя страница 17

17 

 

 
ELEMENT REPLACEMENT 

 
Isolate electrical supply to boiler.  
 
Drain down system.  
 
Disconnect terminal connectors from high limit     
thermostat 
 
Remove thermistor from behind the retaining strap. 
 
Disconnect electrical elements and earth wire. 
 
Disconnect compression fitting from the top and bottom of 
boiler.

  

 

Boiler unit can now be carefully removed. 
 
Remove 8 fixing screws on top flange with and withdraw 
the element assembly. 
 
Remove bottom element positioning bracket. 
 
Remove damaged element.  
 
Refit in reverse order and ensure element seals are fitted.  
 
Check for continuity through 2 terminals on each element. 
 

IMPORTANT: Inspect all seals and change where 
necessary. 

 

FAULT FINDING 

 

Red LED permanently illuminated indicates one of the 
following faults.

 

 

High limit thermostat has operated or faulty electrical 
connections 
 

The boiler has two high limit thermostats fitted, one on the 
heat exchanger and one on the tank. The high limit 
thermostat on the heat exchanger is fitted to the front top 
of the stainless-steel heat exchanger and secured in 
position with 2 retaining clamps. The tank high limit 
thermostat is fitted onto the tank on the left-hand side at 
the top. Check electrical connections on thermostat and 
PCB to check thermostat has not failed using a multi-meter 
check continuity across terminals of thermostat. To reset 
press the red button in centre of thermostat. The 
thermostat may have tripped due to one of the following:  

 

Faulty circulation pump. 
Isolation valve on system closed. 
Air trapped in system. 
Out of calibration limit thermostat. 
Temperature settings on PCB board incorrect. 
No water in system. 
 
 

 

Thermistor

 

 
The boiler has two thermistors fitted, one on the heat 
exchanger and one on the tank. The heat exchanger 
thermistor is fitted to the front top of the heat exchanger 
and secured in position with a clamp, the other end 
terminates with a white connector that plugs on to the PCB 
The tank thermistor is fitted on the left hand side of the 
tank at the top. Check the connections on the board to 
make sure it is correctly fitted, also inspect the thermistor 
for any broken wires. 
 

Mains Inlet Wiring 
 

If the mains supply to the boiler is wired incorrectly on the 
inlet terminal block. Check polarity. 
 

PCB Damage

 

 
Inspect the LED lights and the boiler temperature control 
adjuster for any damage to connections to PCB controller. 
 

Voltage Drop 
 

If the voltage drops below 207 volts. 
 

Red LED flashes indicates one of the following faults. 
 
Poor electrical connection 
 

Check the electrical connections to the elements and the 
PCB controller, a poor controller would show up a fault. 
 

Element Failure 

 
To check elements for failure, disconnect each individual 
element and check continuity through the element if there 
is continuity between the two terminals the element is ok. 
Check each element individually replacing the electrical 
connectors after testing.

 

 
Element Cables 

 
If there is a break in the element cable, this would show up 
as a fault. Check all element cables and connections. 
 

PCB Running Temperature

 

 
The PCB control unit has a built in temperature control 
sensor which protects the PCB from overheating, if the 
board was to overheat the sensor would detect the high 
temperature and shut off the power to the board until the 
board temperature has returned to normal running 
temperature. The boiler will resume operation, but the red 
light will continue to flash to indicate a fault has occurred. 
To reset the board the power must be turned off for 30 
seconds then switched on again.  
To differentiate between a temperature or element 
problem, switch off the power supply to the boiler allow 
the boiler to cool down then switch the power back on, if 
the LED continues to flash then check elements and 
connections. 

Содержание AZTEC 12

Страница 1: ...12kW WALL HUNG MAXI COMBINATION BOILER INSTALLATION OPERATION AND SERVICING INSTRUCTIONS Please read these instructions carefully before installing and operating this appliance TO BE RETAINED BY THE H...

Страница 2: ...USER INSTRUCTIONS 7 SIMPLE FAULT FINDING 8 TECHNICAL DETAILS 8 INSTALLATION 9 VENTILATION REQUIREMENTS 11 WATER SYSTEM 11 12 SEALED WATER SYSTEM REQUIREMENTS 12 14 WIRING INSTRUCTIONS 14 WIRING DIAGR...

Страница 3: ...ulation When handling avoid inhalation and contact with eyes These may be harmful and cause irritation to the skin eyes nose or throat Use disposable gloves facemasks and eye protection After handling...

Страница 4: ...ion The supply voltage to the appliance must never drop below 207 Volts When fitting external controls such as a room thermostat or programmer particular consideration should be given to the wiring of...

Страница 5: ...made are found to have no appliance fault Register your boiler online www trianco co uk product registration What to do in the event of an appliance fault or breakdown Step 1 Always contact your insta...

Страница 6: ...The Building Regulations and Electrical Wiring Regulations BS 7671 1 Always switch OFF the electrical supply before removing the cover 2 If any part of the boiler is modified then the warranty will be...

Страница 7: ...h a thermostatic blending valve it is recommended when commissioning the boiler this is set to 45 C to obtain the best performance from the boiler BOILER INDICATOR LIGHT There are twelve LED indicator...

Страница 8: ...und the boiler being too high Check to ensure that any boiler ventilation is not obstructed If the fault reoccurs contact your engineer IMPORTANT Electrical safety checks should be carried out by qual...

Страница 9: ...TALLED IN A SHOWER COMPARTMENT OR BATHROOM Ensure adequate clearance is allowed for making water connections Access is required to the front and the top of the boiler for servicing The boiler must als...

Страница 10: ...10 Fig 1 2...

Страница 11: ...Rate Min 6kW 8 litres 9kW 10 litres 12kW 12 litres Aztec boilers are approved for use on fully pumped open vented systems and sealed systems Where thermostatic radiator valves are fitted it will be ne...

Страница 12: ...E Failure to ensure the correct vessel size could result in premature failure of the expansion vessel which in turn may adversely affect other components in the system i e circulating pump and diverte...

Страница 13: ...NG MODE Fig 3 SEALED SYSTEM PIPING SCHEMATIC DIAGRAM AZTEC COMBI SCHEMATIC LAYOUT DOMESTIC HOT WATER MODE Fig 4 Fig 5 C H Return C H Flow Plate Heat Exchanger DHW Cold Inlet Diverter Valve Expansion V...

Страница 14: ...The 12kW boiler must be installed in premises having a system impedance of not more than 0 1939 0 1939 A double pole RCD with a trip level sensitivity of 30ma can be used capable of breaking full load...

Страница 15: ...15 Fig 9 Internal Wiring diagram...

Страница 16: ...nd disconnect the temperature button cables from the PCB Disconnect the pump and call plug the thermistor plug the fan where fitted and high limit thermostat plug Disconnect all element cables N B Tak...

Страница 17: ...op of the heat exchanger and secured in position with a clamp the other end terminates with a white connector that plugs on to the PCB The tank thermistor is fitted on the left hand side of the tank a...

Страница 18: ...change Inspect mains terminal block wiring for short circuiting Check electrical elements for earth continuity if element is found to be faulty fit new element Other Information Thermistor Values Ele...

Страница 19: ...OR FLASHING CHECK EXTERNAL CONTROLS ARE CALLING FOR HEAT ARE ISOLATING VALVES OPEN IS THE PUMP RUNNING OPEN ISOLATING VALVES CHECK LIVE NEUTRAL TO PUMP LIVE NEUTRAL OK CHECK SYSTEM PRESSURE PIPE WORK...

Страница 20: ...THEBOILERGO FROMGREENTO AMBERTHENRED CHANGEPCB REFILTO1BAR CHECKFOR LEAKS ISTHESYTEM PRESSURE SUFFICIENTLY CHARGED ISTHETHERMISTER CABLEFAULTY YES ARETHELIMIT STAT CONNECTIONS OK NO NO NO CHANGEPCB YE...

Страница 21: ...LIVE AND NEUTRAL YES NO CHANGE FUSE AND CHECK PUMP YES NO CHANGE PCB CHECK SYSTEM WIRING RESET RCD YES NO FLASHING RED LIGHT ARE CABLES AND CONNECTIONS OK NO IS THERE POWER TO ALL ELEMENTS YES CHANGE...

Страница 22: ...22 ITEM PART No DESCRIPTION QUANTITY 1 HEATER BODY W U 1 2 221850 3kW ELEMENT 4 3 221807 GASKET 2 4 ELEMENT FLANGE W U 1 5 BOTTOM FLANGE W U 1...

Страница 23: ...QUANTITY 1 226216 Left Hand Side Panel 1 2 226212 Top Panel 1 3 226207 Back Panel 1 4 226215 Front Door 1 5 226216 Right Hand Side Panel 1 6 226211 Control mounting Plate 1 7 226209 Bottom Panel 1 8...

Страница 24: ...24...

Страница 25: ...nt Wiring Harness 1 11 Mains terminal block 1 12 Temperature Control Buttons Wiring Harness 1 13 Neon Indicator Green 2 14 221921 Pressure Gauge 1 15 Pump 1 16 501938 Diverter Valve Head 1 17 501930 D...

Страница 26: ...ited Copyright in this brochure and the drawings and illustrations contained in it is vested in TR Engineering Limited and neither the brochure or any part thereof may be reproduced without prior writ...

Отзывы: