VENTILATION

 

REQUIREMENTS 

 

If the appliance is to be fitted in a confined space or 
compartment it is a requirement that adequate ventilation 
is provided to prevent the overheating of the boiler 
controls. Aeration of 110 cm² will be required to the 
compartment, in both high and low positions (see Fig. 2).

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

WATER

 

SYSTEM 

 
IMPORTANT: USE ONLY COMPRESSION FITTINGS WHEN 
CONNECTING THE BOILER TO THE CENTRAL HEATING 
SYSTEM. 
 
ISOLATION VALVES MUST BE FITTED 
 

The installation must comply with the requirements of the 
following codes of practice. 
 
BS 5449 Part 1 Forced Circulation Hot Water Systems 
BS 7074 Part 1 Code of Practice for Sealed Water 
Systems. 
BS 7593 Treatment of water in domestic hot water central 
heating systems. 
 
The water system must be thoroughly flushed out. 
Fill the system. Vent all air from system. Clear any air locks 
and examine the system for water leaks. 
 

 

 
 
 

 
 
 

 
 
IMPORTANT: ENSURE ALL SERVICE VALVES ARE IN OPEN 
POSITION. 

The boiler is supplied with Dia. 22mm tail pipes at the 
base of the boiler for connection to the heating system 
(see Fig: 1). The boiler is also supplied with 15mm tail 
pipes for connection to the DHW circuit (see Fig: 1). 
The boiler must be installed using 22mm compression 
fittings.  
 

 

Model 

Minimum Flow Rate / Min 

6kW 

8 litres 

9kW 

10 litres 

12kW 

12 litres 

 

Aztec boilers are approved for use on fully pumped open 
vented systems and sealed systems. Where thermostatic 
radiator valves are fitted it will be necessary to fit a bypass 
to obtain minimum flow rates

 

IMPORTANT: IF MINIMUM FLOW RATES ARE NOT 
OBTAINED THE BOILER MAY GO TO LOCK OUT ON HIGH 
LIMIT THERMOSTAT. 

System must be flushed out before adding inhibitor to BS 
7593: 1992 treatment of water in central heating boiler. 

IMPORTANT: THIS BOILER IS TO BE FITTED ON FULLY 
PUMPED SYSTEMS ONLY.

 

 

Pump 

 

WARNING! Risk of injury and damage to property! 
Incorrect commissioning can lead to injuries to persons 
and damage to property. 
Commissioning by qualified personnel only! 
Depending on the operating status of the pump or system 
(fluid temperature), the entire pump can become very 
hot. 
Touching the pump can cause burns! 

 

Operation 

The pump is operated using the operating dial. By turning 
the dial, different control modes can be selected, and the 
delivery head or constant speed can be set. 

NOTE:

 All settings are retained if the mains supply is 

interrupted. 
 

Domestic Hot Water 
 

It is recommended the Hot water is timed to be on 15 
minutes before water will be required at the tap. 

 

The domestic hot water blending valve is factory set to 
Minimum to give 45°C outlet temperature. This can be 
adjusted as required but note that any increase will reduce 
the volume of water available.

 

 
 
 

Fig. 2 

Содержание AZTEC 12

Страница 1: ...12kW WALL HUNG MAXI COMBINATION BOILER INSTALLATION OPERATION AND SERVICING INSTRUCTIONS Please read these instructions carefully before installing and operating this appliance TO BE RETAINED BY THE H...

Страница 2: ...USER INSTRUCTIONS 7 SIMPLE FAULT FINDING 8 TECHNICAL DETAILS 8 INSTALLATION 9 VENTILATION REQUIREMENTS 11 WATER SYSTEM 11 12 SEALED WATER SYSTEM REQUIREMENTS 12 14 WIRING INSTRUCTIONS 14 WIRING DIAGR...

Страница 3: ...ulation When handling avoid inhalation and contact with eyes These may be harmful and cause irritation to the skin eyes nose or throat Use disposable gloves facemasks and eye protection After handling...

Страница 4: ...ion The supply voltage to the appliance must never drop below 207 Volts When fitting external controls such as a room thermostat or programmer particular consideration should be given to the wiring of...

Страница 5: ...made are found to have no appliance fault Register your boiler online www trianco co uk product registration What to do in the event of an appliance fault or breakdown Step 1 Always contact your insta...

Страница 6: ...The Building Regulations and Electrical Wiring Regulations BS 7671 1 Always switch OFF the electrical supply before removing the cover 2 If any part of the boiler is modified then the warranty will be...

Страница 7: ...h a thermostatic blending valve it is recommended when commissioning the boiler this is set to 45 C to obtain the best performance from the boiler BOILER INDICATOR LIGHT There are twelve LED indicator...

Страница 8: ...und the boiler being too high Check to ensure that any boiler ventilation is not obstructed If the fault reoccurs contact your engineer IMPORTANT Electrical safety checks should be carried out by qual...

Страница 9: ...TALLED IN A SHOWER COMPARTMENT OR BATHROOM Ensure adequate clearance is allowed for making water connections Access is required to the front and the top of the boiler for servicing The boiler must als...

Страница 10: ...10 Fig 1 2...

Страница 11: ...Rate Min 6kW 8 litres 9kW 10 litres 12kW 12 litres Aztec boilers are approved for use on fully pumped open vented systems and sealed systems Where thermostatic radiator valves are fitted it will be ne...

Страница 12: ...E Failure to ensure the correct vessel size could result in premature failure of the expansion vessel which in turn may adversely affect other components in the system i e circulating pump and diverte...

Страница 13: ...NG MODE Fig 3 SEALED SYSTEM PIPING SCHEMATIC DIAGRAM AZTEC COMBI SCHEMATIC LAYOUT DOMESTIC HOT WATER MODE Fig 4 Fig 5 C H Return C H Flow Plate Heat Exchanger DHW Cold Inlet Diverter Valve Expansion V...

Страница 14: ...The 12kW boiler must be installed in premises having a system impedance of not more than 0 1939 0 1939 A double pole RCD with a trip level sensitivity of 30ma can be used capable of breaking full load...

Страница 15: ...15 Fig 9 Internal Wiring diagram...

Страница 16: ...nd disconnect the temperature button cables from the PCB Disconnect the pump and call plug the thermistor plug the fan where fitted and high limit thermostat plug Disconnect all element cables N B Tak...

Страница 17: ...op of the heat exchanger and secured in position with a clamp the other end terminates with a white connector that plugs on to the PCB The tank thermistor is fitted on the left hand side of the tank a...

Страница 18: ...change Inspect mains terminal block wiring for short circuiting Check electrical elements for earth continuity if element is found to be faulty fit new element Other Information Thermistor Values Ele...

Страница 19: ...OR FLASHING CHECK EXTERNAL CONTROLS ARE CALLING FOR HEAT ARE ISOLATING VALVES OPEN IS THE PUMP RUNNING OPEN ISOLATING VALVES CHECK LIVE NEUTRAL TO PUMP LIVE NEUTRAL OK CHECK SYSTEM PRESSURE PIPE WORK...

Страница 20: ...THEBOILERGO FROMGREENTO AMBERTHENRED CHANGEPCB REFILTO1BAR CHECKFOR LEAKS ISTHESYTEM PRESSURE SUFFICIENTLY CHARGED ISTHETHERMISTER CABLEFAULTY YES ARETHELIMIT STAT CONNECTIONS OK NO NO NO CHANGEPCB YE...

Страница 21: ...LIVE AND NEUTRAL YES NO CHANGE FUSE AND CHECK PUMP YES NO CHANGE PCB CHECK SYSTEM WIRING RESET RCD YES NO FLASHING RED LIGHT ARE CABLES AND CONNECTIONS OK NO IS THERE POWER TO ALL ELEMENTS YES CHANGE...

Страница 22: ...22 ITEM PART No DESCRIPTION QUANTITY 1 HEATER BODY W U 1 2 221850 3kW ELEMENT 4 3 221807 GASKET 2 4 ELEMENT FLANGE W U 1 5 BOTTOM FLANGE W U 1...

Страница 23: ...QUANTITY 1 226216 Left Hand Side Panel 1 2 226212 Top Panel 1 3 226207 Back Panel 1 4 226215 Front Door 1 5 226216 Right Hand Side Panel 1 6 226211 Control mounting Plate 1 7 226209 Bottom Panel 1 8...

Страница 24: ...24...

Страница 25: ...nt Wiring Harness 1 11 Mains terminal block 1 12 Temperature Control Buttons Wiring Harness 1 13 Neon Indicator Green 2 14 221921 Pressure Gauge 1 15 Pump 1 16 501938 Diverter Valve Head 1 17 501930 D...

Страница 26: ...ited Copyright in this brochure and the drawings and illustrations contained in it is vested in TR Engineering Limited and neither the brochure or any part thereof may be reproduced without prior writ...

Отзывы: