background image

3

HOW TO INSTALL TREX DECKLIGHTING/

CONTINUED

Timer Operation Instructions

1.  Select the mode of operation:

» Dusk to Dawn
» 2–8 hours
» Always “ON”
» “OFF”

Program repeats daily. When power is flowing to lights, 
green light above POWER is on.

Installing Post Cap Lights

NOTE: 

Install post cap lights after the railing system, post 

sleeve skirt, and post sleeve have been installed.

1.  Connect male lead from wiring to female connector

from cap. Also attach male-to-male connection wires
in between each splitter. Continue until all wiring
from lights is attached to splitters and connector
wires are attached in between splitters.

(See Making Connections section for details.)

2.  After verifying wiring is correct by turning lights on,

attach cap to top of post with silicone caulk.

Installing Deck Rail Lights 

NOTE: I

nstructions shown below are for new deck  

installation and are shown 

BEFORE

 railing system has 

been installed.

1.  Place post sleeve over

pressure-treated post
and mark desired
height, centered on post
sleeve for deck rail light
location.

NOTE:

 

If deck boards are 

not installed yet, place a 
deck board on framing to 
ensure post sleeve is at correct height.

2.  Drill a 1" (25 mm) hole through post sleeve. Drill deep

enough to mark location on pressure-treated post.

3.  Remove the post sleeve from the post.

4.  Drill out existing hole on pressure-treated post

3/4" (19 mm) deep. Drill two additional holes
vertically below main hole—this will allow space for
wiring after post sleeve is attached.

5.  Leave enough slack at top of lead wire and attach

lead wire to post using staples. Attach lead wire to
splitter under decking.

TIP: 

To hold lead wire in place at drilled-out location, 

use painters tape.

Installing Lights

 

6.  Slide post sleeve back over post. If using a post

sleeve skirt, make sure to install the skirt first.
Connect plug on deck rail light to lead wire and tuck
wiring into previously drilled-out pockets on post.

7.  Align holes for screws horizontally and attach fixture

base to post with provided screws.

2

2

3

1

6"

(152 mm)

1

1

2

Post

Post 

Sleeve

3

1

2

3

4

1

5

2

2

1

6

1

7

2

www.SolarPostCapsDirect.com  |  (800) 878-7829  |  [email protected]

Содержание DeckLighting

Страница 1: ...ly premature fixture failure and is not covered by the Trex limited warranty You must use a Trex transformer on all Trex lighting installations Never fully drive staples when securing wire Wire should move under staple ALWAYS protect any wire that is close to the ground with conduit or wire loom to prevent rodent damage Cap all unused female connections with caps provided or weather resistant sili...

Страница 2: ...d attach wire to post with male connection at top of post female connection would be at bottom of post and connect into splitter Avoid running wire on side of post where railing brackets or deck rail lights will be installed Leave approximately 6 152 mm of lead at top to make connections Staple to frame and posts with cable staples at least 1 4 6 mm wide DO NOT crush wire insulation with staples M...

Страница 3: ...red height centered on post sleeve for deck rail light location NOTE If deck boards are not installed yet place a deck board on framing to ensure post sleeve is at correct height 2 Drill a 1 25 mm hole through post sleeve Drill deep enough to mark location on pressure treated post 3 Remove the post sleeve from the post 4 Drill out existing hole on pressure treated post 3 4 19 mm deep Drill two add...

Страница 4: ...itter Also attach male to male connection wires in between each splitter Continue until all wiring from lights is attached to splitters and connector wires are attached in between splitters See Making Connections section for details NOTE DO NOT install riser light or deck rail light into top or bottom rails or balusters Installing Recessed Deck Lights NOTE Install recessed deck lights after instal...

Отзывы: