background image

STEP 12:

  

Fasten the ball and cord to part 

J

 and 

K

 of the frame 

with the attached "Eye-Bolt" as shown here. 

Adjust the ball height by moving the attached hook 

to the desired hole in the frame.

BALLFIELD BALL ATTACHMENT INSTRUCTIONS

BALLFIELD BALL CHANGE INSTRUCTIONS

CHANGE BASEBALL TO SOFTBALL:

  

A

 - Push ball rope through the loop in the adjustable 

      hanging cord. 

B

 - Pass the ball through the loop of rope attached 

      to the ball. 

C

 - Pull the ball down until the knot tightens where 

      the two cords join.

A

 

B

 

C

 

Содержание BallField BF199

Страница 1: ...JOINTS TO AVOID INJURY MAKE SURE TETHERED BALLS ARE SECURELY FASTENED BEFORE HITTING WARNING Make sure the area is clear before swinging a bat Serious injury could occur Useunderadultsupervisiononly...

Страница 2: ...tting Qty 4 Qty 2 Qty 2 Qty 2 Qty 2 Qty 2 Qty 2 Qty 2 Qty 2 Qty 6 Nuts Bolts Washers Tools Softball Baseball Adjustable Rope T Qty 2 U Qty 2 V Qty 12 VV Qty 2 W Qty 2 X Qty 12 Y Qty 34 YY Qty 4 XX Qty...

Страница 3: ...and two H parts Lay them flat on the ground and assemble as illustrated Connect the parts by sliding the tapered ends into the larger ends and lock in place with the push pins BALLFIELD FRAME ASSEMBL...

Страница 4: ...ASSEMBLY SIDE VIEW A F P V Y Y X Y Y Z A X Y Y V H F STEP 2 Locate parts F and P Following illustration V Frame Assembly Bottom View to the right insert part F into the pivot slot on part A align the...

Страница 5: ...LY INSTRUCTIONS Continued TOP VIEW C G I SIDE VIEW C I P X Y Y V Z Y V Y V Y Y X STEP 4 Following illustration Top View to the right insert part I into the pivot slot on part C align the holes and fas...

Страница 6: ...parts N are on the same side as parts B and A O N N L L M M O B A G G H H D C STEP 7 Next take part O of the rebounder frame and align with the holes in part C of the BallField frame Using the longer...

Страница 7: ...Q and part N SIDE VIEW N Q X Y Y W XX ZZ YY U Y VV A F P STEP 9 Next align part Q with the hole on part A of the BallField frame Insert bolt U through the outside of the BallField frame slide washer...

Страница 8: ...ame using supplied bungees part R Wrap the bungee through the top most net square and around the frame Continue wrapping bungees along the ball side of the frame using a total of 5 Follow the same pro...

Страница 9: ...middle bungee on each side Make sure to wrap each bungee twice as shown above This tension gives the net the rebounding ability Finish attaching the remaining bungees to the rebounder frame REBOUNDER...

Страница 10: ...ed hook to the desired hole in the frame BALLFIELD BALL ATTACHMENT INSTRUCTIONS BALLFIELD BALL CHANGE INSTRUCTIONS CHANGE BASEBALL TO SOFTBALL A Push ball rope through the loop in the adjustable hangi...

Страница 11: ...S INJURY MAY OCCURE KEEP FINGERS AND HANDS CLEAR OF JOINTS AS THE FRAME FOLDS BALLFIELD FRAME FOLDING INSTRUCTIONS LAY FRAME ON REBOUNDER SIDE When folding the BallField for storage place the frame on...

Отзывы: