background image

_INSTALLATION

Page 10

Each tub is individually tested in the company 
to guarantee its perfect operation.

During this phase of the installation, you must 
test the product to ensure that all adjustments 
made in the company have been maintained. 
Due  to  improper  transport  and  installation, 
slight leak problems may arise occasionally.

In the event of leaks, on the lower part or along 
the  edge  near  the  closure  handle,  given  the 
certainty  of  state-of-the-art  assembly  as 
previously described, work on the shape of the 
tub by opening and closing the front side

.

To  do  this,  on  the  frame  at  the  centre  front, 
there  is  an  upright  with  adjustable  head 
consisting of a plate with threaded rod screwed 
onto the tub and by two nuts, one on front and 
one on the rear side.
This  system  is  able  to  slightly  modify  the 
closing layout.

A) 

Base leak

: it will be necessary to screw in 

the rear nut on the riser bringing it to stop on 
the plate assembled on the tub. Screw in the 
external nut a half a rotation at a time until the 
leak is resolved. Tighten the rear nut again on 
the riser. This operation allows us to open the 
front side.

B) 

Leak on top lateral side:

 you will need to 

unscrew by half a turn to the front nut to the 
upright and do the same on the rear nut until 
you fix the leak. With this operation you have 
closed the front side

ATTENTION

The  regulations  will  be  minimal  to  avoid 
compromising tightness.

At  the  end  of  each  adjustment,  the  two  nuts 
must be firmly tightened to the upright.

Middle upright

Plate

Front and rear 
nut adjustment

Содержание GEN-X

Страница 1: ...GEN X INSTALLATION MANUAL 01_2018...

Страница 2: ...Page 2...

Страница 3: ...being We would like to remind you that all our products are built with top quality materials and are carefully tested according to safety standards This guarantee of quality and comfort is accompanie...

Страница 4: ..._TABLE OF CONTENTS _ INTRODUCTION INSTALLATION MANUAL SAFETY PROVISIONS _ INSTALLATION _ DOCUMENTATION WARRANTY CONDITIONS 5 12 6 Page 4 WARRANTY CERTIFICATE DISPOSAL AT END OF LIFE...

Страница 5: ...performed by experienced qualified personnel in compliance with local and national provisions relating to civil and industrial systems The installer before connecting the electrical and hydraulic equi...

Страница 6: ...uffer zones Standards forbid any electrical installation plug socket switches lights etc in the zone surrounding the product for a distance of at least 60 cm and a height of 230 cm min 60 cm min 60 cm...

Страница 7: ...hold it under the edge of the tub Put it near the place where it will be installed Remove the panels unscrewing the holding screws at the base and removing them downwards If not already prepared assem...

Страница 8: ...tub you must carefully level it ATTENTION Incorrect execution of these regulations may result in imperfect tightness of the door Initially feet 2 and 5 are lifted off the ground To adjust the level w...

Страница 9: ...f the door Once positioning is obtained lock the feet using the nut on each of them Now you can adjust feet 2 and 5 until they touch the floor without forcing Lock the feet with the nut found on each...

Страница 10: ...ith threaded rod screwed onto the tub and by two nuts one on front and one on the rear side This system is able to slightly modify the closing layout A Base leak it will be necessary to screw in the r...

Страница 11: ...ront side then under the door and lastly under the short side To lock the panel insert it under the edge of the tub between the edge and the thrust springs Use the supplied wedges Fit back at the base...

Страница 12: ...property due to non compliance with the instructions given in this manual and in the service manual Any intervention performed in the absence of an obvious reasonable defect of the product as well as...

Страница 13: ...nd of its service life by reducing negative impacts on the environment and improving the efficiency of resource use applying the polluter pays principle ensuring prevention preparation for reuse recyc...

Страница 14: ..._NOTES Page 14...

Страница 15: ..._NOTES Page 15...

Страница 16: ...Gruppo Tre S s p a 01036 Nepi Vt Italy S S Cassia Km 36 400 Industrial zone Settevene Tel 39 0761 527242 Fax 39 0761 527223 e mail info gruppotres it www gruppotres it...

Отзывы: