Main Assembly
Parts Needed
SC-2- Slide Component 2-
(1)
SC-3- Slide Component 3-
(1)
Hardware Needed
SHK-2- 5/16” USS Flatwasher-
(48)
SHK-4- 5/16” x 1” Hex Bolt-
(24)
SHK-6- 5/16” Nylon Locknut-
(24)
Step:
Again the first thing we want to do now is find the inner
and outer seam of SC-2. The inner seam being on the inside of the
curve and the outer seam being on the outside of the curve. When
attaching this part to SC-1 we are going to take the inner seams
and line them up, then rotate the SC-2 CLOCKWISE one hole as
shown above. Then using (2) SHK-2’s (5/16” Flatwashers), (1)
SHK-4 (5/16” x 1” Hex Bolt), and (1) SHK-6 (5/16” Nylon Lock
-
nut) for each hole we are going to lag down the part.
** Depending on which way the unit is facing the step may be
reversed**
SC-1
SC-2
Inner Seam
Inner Seam
SC-2
SC-3
Inner Seam
Inner Seam
Step:
The first thing we want to do now is find the inner and
outer seam of SC-3. The inner seam being on the inside of the
curve and the outer seam being on the outside of the curve. When
attaching this part to SC-2 we are going to take the inner seams
and line them up, then rotate the SC-3 CLOCKWISE one hole as
shown above. Then using (2) SHK-2’s (5/16” Flatwashers), (1)
SHK-4 (5/16” x 1” Hex Bolt), and (1) SHK-6 (5/16” Nylon Lock
-
nut) for each hole we are going to lag down the part.
** Depending on which way the unit is facing the step may be
reversed**