PAGE 22
MEGA 120E PUMP OPERATION / MAINTENANCE MANUAL
•
Snap in tie bolt caps.
4.9 TESTING
4.9.a Performance Test
•
Start with air regulator at low (< 15 psi) pressure setting.
•
Pump must prime once pressure is increased
•
60 psig Supply Pressure
•
Check for fluid leaks, listen for air leaks, check for irregularity
•
Prepare the pump for drying
4.9.b Dry Pump
•
Connect vacuum hose to discharge line
•
Connect purge line to fluid inlet
•
60 psig Supply Pressure
•
Cycle pump & vacuum dry by rotating pump side to side for 30 seconds.
•
Turn off Air Supply and allow the pump to purge for 5 minutes.
4.9.c Dry Suction
•
20 psig Supply Pressure Target
•
Record Suction Value
•
Target = 10 in-Hg