1-69
Machine Maintenance Procedures
Replacing the LCD Bezel
0
1. Install the bezel cap onto its slot on the bottom side of the LCD cover, and then press
the cap firmly to secure the latches to the LCD cover (
Figure 1-81. Replacing the LCD Bezel
2. Start pressing along the bottom side (A) of the LCD bezel to secure the latches to the
LCD cover (
3. Continue pressing upward along the left and right sides (B) of the LCD bezel to
engage the latches (
4. Finally, press along the upper side (C) of the LCD bezel to fully secure the bezel to the
LCD cover (
Содержание P214-52
Страница 1: ...TravelMate P214 52 P214 52G RECYCLE GUIDE...
Страница 21: ...1 21 Machine Maintenance Procedures ID Size Torque Quantity Screw Type Red Call out M2 5 4 0 3 0 15 kgf cm 2...
Страница 23: ...1 23 Machine Maintenance Procedures ID Size Torque Quantity Screw Type Red Call out M2 0 3 0 2 0 10 kgf cm 3...
Страница 25: ...1 25 Machine Maintenance Procedures ID Size Torque Quantity Screw Type Red Call out M2 0 3 0 2 0 10 kgf cm 1...
Страница 53: ...1 53 Machine Maintenance Procedures ID Size Torque Quantity Screw Type Red Call out M2 5 2 5 3 0 15 kgf cm 8...
Страница 63: ...1 63 Machine Maintenance Procedures ID Size Torque Quantity Screw Type Red Call out M2 5 2 5 3 0 15 kgf cm 8...
Страница 83: ...1 83 Machine Maintenance Procedures ID Size Torque Quantity Screw Type Red Call out M2 0 3 0 2 0 10 kgf cm 2...
Страница 88: ...Machine Maintenance Procedures 1 88 ID Size Torque Quantity Screw Type Red Call out M2 0 3 0 2 0 10 kgf cm 1...
Страница 92: ...Machine Maintenance Procedures 1 92 ID Size Torque Quantity Screw Type Red Call out M2 5 4 0 3 0 15 kgf cm 2...
Страница 95: ...1 95 Machine Maintenance Procedures ID Size Torque Quantity Screw Type Red Call out M2 0 3 0 2 0 10 kgf cm 1...