TranzX DROP BAR LEVER INTERNALLY ROUTED POST Скачать руководство пользователя страница 4

INTERNALLY ROUTED DROPPER POST AND DROP BAR LEVER

INTERNAL CABLE ROUTING DROPPER POST INSTALLATION

Place saddle rails into clamp, 

adjust angle and fore/aft 

position per bike fit, tighten 

bolts with 5mm Allen wrench to 

8-10Nm. 

5

Route the housing from 

handlebar dropper lever location 

along or through downtube and 

up through the seat tube making 

sure that there is enough 

housing to reach from base of 

installed dropper post.

1

Assemble housing, housing end 

cap, cable head nut and inner 

shifter cable as shown and slide 

cable into the housing. 

2

Insert cable head nut into 

dropper post actuator. Pull 

actuator rod and insert 

cable through slot. Set 

cable housing into the 

bottom of housing stop on 

actuator. 

3

Install dropper post into seat 

tube by inserting post slowly 

and pulling the housing in the 

same direction, keeping the 

housing set into the cable 

housing stop. Tighten seat tube 

clamp to manufacturer's 

recommended torque 

specification.

4

Отзывы: