
Release 3.0
PAGE 41
Setup
Aero 60/90/130
4.5 Standard Errors
Error
Action
PAD RAM DOWN TIMEOUT
Check bottom proximity switch on vertical cylinder
Check up/down valve
PAD RAM REAR TIMEOUT
Check rear proximity switch on horizontal cylinder
Check pad forward/back valve
E-STOP
Pull E-Stop to release
NO AIR
Check air connection
Check up proximity switch
Check front proximity switch
Check up/down valve
Check pad forward/back valve
TAPE CLEANER
POS TIMEOUT
Check tape cleaner proximity switches on cylinder
Check tape cleaner in/out valve
PAD RAM UP TIMEOUT
Check top proximity switch on vertical cylinder
Check up/down valve
BATCH CT. FINISH
Press reset to clear batch count, then press back
to go to previous screen
PAD RAM FRONT TIMEOUT
Check front proximity switch on horizontal cylinder
Check pad forward/back valve
AUTOMATION IN
POSITION TIMEOUT
Check XE INPUT
Содержание AERO 130
Страница 2: ...Aero 60 90 130 Release 3 0 PAGE 2 THIS PAGE LEFT BLANK...
Страница 11: ...Installation Instructions Aero 60 90 130 Release 3 0 PAGE 11 2 5 Machine Dimensions AERO 60 AND 90...
Страница 12: ...Installation Instructions Aero 60 90 130 Release 3 0 PAGE 12 AERO 130...
Страница 18: ...Release 3 0 PAGE 18 Operating Controls Aero 60 90 4 Operating Controls 4 1 Description of the Operating Panel...
Страница 20: ...Release 3 0 PAGE 20...