ENGLISH
8
QFK62BE
Installation (continued)
FINAL INSPECTION
- Open your home's hot and cold water
supply valves and carefully inspect all
connections for leaks .
-
Move the valve handle (13) to the open
mixed position by turning it to the middle
and pulling it away from the faucet .
- Run the water uninterrupted for about one
minute to remove any residue from the
lines and inspect all connections for leaks
once again .
Valve Handle (13)
Fig. 6