Start Up

40

 RT-SVX26R-EN

pressure of 0.3" w.c. to 2.5" w.c. respectively with a 
deadband adjustment range from 0.2" w.c. to 1.0" w.c. The 
setpoint is adjustable on the RTAM Static Pressure 
Setpoint potentiometer or through ICS.

Example:

Supply Duct Static Setpoint = 2.0" w.c.

(RTAM) deadband = 0.2" w.c. (RTAM)

Duct Static Control Range = 1.9" w.c. to 2.1" w.c.

VHR Relay Output

For standalone VAV unit operation, the VHR output should 
be wired to drive VAV boxes to maximum position during 
all heating modes and unoccupied periods. The VHR 
contacts are shown in the de-energized position and will 
switch (energize) during the above mentioned operating 
modes.

To configure the proper potentiometer setpoints, connect 
a multi-meter across the customer connection header (J7) 
to the pins listed in 

Table 16

 below. 

Figure 34.

Supply duct static pressure control

Figure 35.

VHR relay output

Table 15. Variable air volume mode operation

System Mode

Fan “Auto”

Fan “On”

Heat

DWU Active
DWU Off

DWU

2

Off

4

DWU

2

 

VAV Heating

4

 

Cool

VAV Cooling

1

VAV Cooling

1

Auto

DWU Active
DWU Off

DWU or 
Cooling

1,2,3,4

VAV Cooling

1

DWU or 
Cooling

1,2,3,4

VAV Cooling or 
Heating

1

Off

Off

4

 Off

4

 

Notes:

 1. If Cooling is selected the supply fan will run continuously. If VAV 

Heating is activated the supply fan will run continuously.

 2. If Daytime Warmup is Activated, the supply fan will run

     continuously.

 3. Auto changeover between Cooling and Daytime

     Warmup depends upon the DWU initiate setpoint.

 4. The fan will be Off any time the system selection switch

     is “Off”.

Table 16. VAV setpoints

Resistance 

(Ohms)

DC volts

Supply Air Cooling Setpoint (J7-

3,4)

Deg F

240

0.97

50.37

280

1.09

52.30

320

1.21

54.24

360

1.32

56.09

410

1.45

58.18

450

1.55

59.80

Resistance 

(Ohms)

DC volts

Supply Air Pressure Setpoint (J7-

1,2)

“WC”

100

0.45

0.30

350

1.30

0.98

540

1.75

1.49

730

2.11

2.00

>900

>2.38

2.5

Note:

To reduce the risk of coil freezing, it is not recommended to set the 

supply air temperature setpoint below 50°F.

Table 15. Variable air volume mode operation

System Mode

Fan “Auto”

Fan “On”

Содержание Voyager YH Series

Страница 1: ...nowledge and training Improperly installed adjusted or altered equipment by an unqualified person could result in death or serious injury When working on the equipment observe all precautions in the l...

Страница 2: ...ardous situation which if not avoided could result in minor or moderate injury It could also be used to alert against unsafe practices NOTICE Indicates a situation that could result in equipment or pr...

Страница 3: ...n operation and maintenance procedures for air cooled systems By carefully reviewing the information within this manual and following the instructions the risk of improper operation and or component d...

Страница 4: ...with Belt Drive Indoor Fan 37 Start Up 38 Economizer Start Up 38 Compressor Start Up 38 Dehumidification Option 39 Heating Start Up 39 Variable Air Volume Applications Multi zone Traditional VAV 39 Fi...

Страница 5: ...Speed Oversized Motor A Single Zone Variable Air Volume Standard Motor w Shaft Grounding Ring B Multi Speed Standard Motor w Shaft Grounding Ring C Single Zone Variable Air Volume Oversized Motor w S...

Страница 6: ...Unit Mounted Disconnect or Circuit Breaker 6 Available factory installed on downflow AND horizontal units Verify with ordering system 7 Cannot be fused 8 Must be factory installed when using Through...

Страница 7: ...lding management type control system It allows the control and monitoring of the system through an ICS panel The module can be ordered from the factory or ordered as a kit to be field installed Follow...

Страница 8: ...filter switch has been closed for at least 2 minutes The system will continue to operate regardless of the status of the filter switch Please note that on units equipped with factory installed MERV 1...

Страница 9: ...ctronic sensor features four system switchsettings Heat Cool Auto and Off and two fan settings On and Auto with four system status LEDs It is a manual or auto changeover control with dual setpoint cap...

Страница 10: ...be performed on the smoke detector to insure that it will functionproperly For detailedinstructions concerning these checks and procedures refer to the appropriate section s of the smoke detector Inst...

Страница 11: ...ek medical attention Skin Contact Wash affected areas gently with soap and warm water after handling Storage Take precautions to prevent condensate from forming inside the unit s electrical compartmen...

Страница 12: ...12 RT SVX26R EN Unit Dimensions Figure 1 Typical installation clearance for single and multiple unit applications 5 8 5 0...

Страница 13: ...ional data for 12 tons standard efficiency units DOWNFLOW CONDENSATE DRAIN CONN 1 25MM NPT 1 2 NPT GAS CONNECTION SERVICE GAUGE PORT ACCESS 2 51MM DIA HOLE UNIT POWER WIRE 7 8 22MM DIA HOLE UNIT CONTR...

Страница 14: ...ficiency units SUPPLY RETURN CLEARANCE 48 1219 MM CLEARANCE 60 1524 MM CLEARANCE 18 457 MM CLEARANCE 38 965 MM HORIZONTAL CONDENSATE DRAIN CONNECTION 1 0 IN NPT FILTER ACCESS DOOR HORIZONTAL UNITS ONL...

Страница 15: ...sions RT SVX26R EN 15 Note NPT Gas Connection Figure 6 Unit dimensional data 15 25 tons high efficiency units Figure 7 Unit dimensional data 15 25 tons standard efficiency units 12 25 tons high effici...

Страница 16: ...Unit Dimensions 16 RT SVX26R EN Figure 8 Horizontal duct dimensional data 15 25 tons standard efficiency units 12 25 tons high efficiency units...

Страница 17: ...69 565 412 455 YS 300G 2020 644 529 386 461 YH 300G 2291 734 603 432 523 YH 300 Reheat unit 2208 759 539 402 508 Table 2 Typicalunitweightsandpointloadingdata kg Unit Models Net Weights Corner Weights...

Страница 18: ...the unit onto the curb Make sure that the gasket on the curb is not damaged while positioning the unit WARNING Heavy Objects Ensure that all the lifting equipment used is properly rated for the weigh...

Страница 19: ...ements The checklist listed below is a summary of the steps required to successfully install a commercial unit This checklist is intended to acquaint the installing personnel with what is required in...

Страница 20: ...e drain location A condensate trap must be installed at the unit due to the drain connection being on the negative pressure side of the fan Install the P Trap using the guidelines in Figure 11 A conde...

Страница 21: ...nts The termination points depending on the customer option selected would be a factory mounted nonfused disconnect switch UDC or circuit breaker UCB Provide proper grounding for the unit in accordanc...

Страница 22: ...nductor sizing guidelines that must be followed when interconnecting the DC binary output devices and the system components utilizing a DC analog input output signal to the unit Note Resistance in exc...

Страница 23: ...Installation RT SVX26R EN 23 Figure 15 ReliaTel relative humidity sensor dehumidification option Figure 16 ReliaTel humidistat dehumidification option...

Страница 24: ...7 Typical field wiring diagrams for optional controls ReliaTel only BAYSENS075 BAYSENS075 BAYSENS119 BAYSENS110 BAYSENS108 BAYSENS106 BAYSENS073 BAYSENS074 BAYSENS075 ASYSTAT669A OPTIONAL REMOTE SENSO...

Страница 25: ...d Example 2 illustrates three sensors squared in a series parallel circuit Example 3 illustrates the circuit required for this senor Table 5 lists the temperature versus resistance coefficient for all...

Страница 26: ...Installation 26 RT SVX26R EN Table 6 Space temperature averaging examples...

Страница 27: ...0 w c Manifold Gas Pressure b b Staged gas heat units have a negative pressure gas valve Never adjust the staged gas pressure valve to a positive pressure 0 2 w c Combustion Blower Suction Pressure 1s...

Страница 28: ...on Connect the phase sequence indicator leads to the terminal block or to the Line side of the optional factory mounted disconnect switch as follows Black phase A to L1 Red phase B to L2 Yellow phase...

Страница 29: ...operation canbe activatedindividually by temporarilyshortingacrossthe Test terminalsfortwoto three seconds The Liteport LED located on the RTRM module will blink when the test mode has been initiated...

Страница 30: ...ty found on the unit nameplate and the N E C 4 Route low voltage class II control wiring through hole in base of unit but not through high voltage conduit Feedcontrolwiringthroughbushingprovided on si...

Страница 31: ...WARNING Hazardous Voltage w Capacitors Disconnect all electric power including remote disconnects and discharge all motor start run capacitors before servicing Follow proper lockout tagout procedures...

Страница 32: ...or as follows 1 Remove the smoke detector assembly from its shipping position in the indoor fan compartment This assembly is attached with three screws to the indoor fan board near the top of the unit...

Страница 33: ...the barometric relief damper and reach inside through the barometric relief outlet to access and connect the copper exhaust elbow to the smoke detector exhaust tube 8 Connect the leg of the plastic el...

Страница 34: ...at airflow through the unit is adequate for proper sampling by the return air smoke detector complete adherence to the maintenance procedures including recommended intervals between filter changes and...

Страница 35: ...NG Hazardous Voltage w Capacitors Disconnect all electric power including remote disconnects and discharge all motor start run capacitors before servicing Follow proper lockout tagout procedures to en...

Страница 36: ...dependent on the airflow configuration cabinet size and fresh air selection Refer to Figure 28 through Figure 32 Refer to BAS SVX40 EN for instructions and troubleshooting procedures Figure 28 WCI mo...

Страница 37: ...across the Test 1 and Test 2 terminals on LTB1 one time to start the Minimum Ventilation Test Once the supply fan has started check for proper rotation The direction of rotation is indicated by an ar...

Страница 38: ...e additional time if continuing from previous component start up or until the desired startup component Test is started Scroll Compressors a Once each compressor has started verify that the rotation i...

Страница 39: ...standalone control Supply Air Temperature Control Occupied Cooling and Heating The RTRM is designed to maintain a selectable supply air temperature of 40 F to 80 F with a 3 5 F deadband To reduce the...

Страница 40: ...System Mode Fan Auto Fan On Heat DWU Active DWU Off DWU2 Off4 DWU2 VAV Heating4 Cool VAV Cooling1 VAV Cooling1 Auto DWU Active DWU Off DWU or Cooling1 2 3 4 VAV Cooling1 DWU or Cooling1 2 3 4 VAV Coo...

Страница 41: ...in place Close the main disconnect switch or circuit protector switch that provides the supply power to the unit s terminal block or the unit mounted disconnect switch Figure 36 RTAM module Static pr...

Страница 42: ...arge line thermostat DLT2 are closed When the second stage compressor is energized it starts to maintain the zone temperature to within 2 F of the sensor setpoint at the sensed location ReliaTel Contr...

Страница 43: ...y By utilizing a humidity sensor and a temperature sensor in both the return air stream and the outdoor air stream the unit control processor RTRM will be able to establish which conditions are best s...

Страница 44: ...ompressor operation The cycle will last for a period of 3 minutes 3 The 90 minute cycle count will be reset anytime there is a normal transition between cooling and dehumidification Transitioning from...

Страница 45: ...a range of 0 100 and the minimum position that will be utilized while the supply fan is at high speed will be set with the Building Design Min Position pot with a range of 0 50 If the Building Design...

Страница 46: ...Cooling Units The minimum fan speed for units with 2 stages of DX Cooling will be 63 of the unit s full airflow capacity At Stage 1 of DX Cooling the Fan Speed will be at a minimum of 63 and at Stage...

Страница 47: ...to a point that would be higher than the calculated linear line between the Design Minimum Position setpoints at Minimum and Maximum fan speed command the minimum position will be limited to the poin...

Страница 48: ...ng purge the supply fan will track based on the appropriate minimum speed for the associated number of compressors energized After the Purge Cycle is complete the Supply Fan will be released to normal...

Страница 49: ...ntiometer or a remotely mounted potentiometer The setpoint ranges are from 50 F to 90 F When the zone temperature meets or exceeds the MWU setpoint the unit will switch to the Cooling mode The economi...

Страница 50: ...eating types the unit will utilize 100 full airflow during all active heating periods like traditional Constant Volume units If the unit has modulatingheat the unitcanbemadetododischargeheatingwithVAV...

Страница 51: ...The shutdown is communicated to Tracer if applicable and the Heat and Cool LED outputs RTRM J6 7 and J6 8 will blink at a nominal rate of 1 blink per second Phase Monitor The Phase Monitor is a 3 pha...

Страница 52: ...Frostat control monitors the evaporator coil temperature to prevent the evaporator from freezing due to low operating temperatures whenever there is a demandfor cooling Whenaclosedcircuithasoccurredfo...

Страница 53: ...s number represents the force in pounds required to give the needed deflection 6 Compare the force scale reading Step 5 with the appropriate force valuelistedin Table 23 p 53 Ifthe force reading is ou...

Страница 54: ...he belt is frayed or worn replace it Refer to Fan Belt Adjustment Belt Drive Units p 53 for belt replacement and adjustments Verify that all wire terminal connections are tight Remove any corrosion pr...

Страница 55: ...the blanks provided 1 Complete Unit Model Number _____________________________________________________ 2 Unit Serial Number _____________________________________________________ 3 Wiring Diagram Numb...

Страница 56: ...he sequence of operations for each mode to assist in verifying proper operation Make the necessary repairs and proceed to Step 7 and Step 8 7 If no abnormal operating conditions appear in the test mod...

Страница 57: ...Cool Failure Emergency Stop is activated Method 2 The second method for determining system status is done by checkingvoltagereadings atthe RTRM J6 The system indication descriptions and the approxima...

Страница 58: ...he SERVICE LED will be turned On again after the 2 1 minute ignore delay This LED being turned On will have no other affect on unit operation It is an indicator only Fan Failure Switch When the Fan Fa...

Страница 59: ...operation exit the test mode Turn the fan on continuously at the ZSM by pressing the button with the fan symbol If the fan comes on and runs continuously the ZSM is good If you are not able to turn th...

Страница 60: ...onomize Slow Flash Normal Not OK to Economize Fast Flash 1 4 Second On 2 Seconds Off Error Code Communications Failure Pulse Flash 1 30 Second On 1 4 Second Off 2 Seconds between pulse sequences Error...

Страница 61: ...300 50 60HZ 2 Stage Gas Heat or Modulating Gas Heat with or without Dehumidification Modules 1213 1015 YS H 150 300 Gas Heat Component layout 1213 2242 YS H 150 300 Gas Heat Table 29 Wiring diagrams f...

Страница 62: ...u specific legal rights and you may also have other rights which vary from state to state Trane 2701 Wilma Rudolph Blvd Clarksville TN 37040 1008 Attention Manager Product Service GW 602 4800 Models 2...

Страница 63: ...is any application where the end purchaser uses the product for other than personal family or household purposes A 5 year limited warranty is provided for the optional Low Leak Economizer when combin...

Страница 64: ...ications without notice We are committed to using environmentally conscious print practices Trane and American Standard create comfortable energy efficient indoor environments for commercial and resid...

Отзывы: