Corrective Maintenance
Compressor Installation
The compressor may have problems
mainly at two levels: mechanical or
electric. In both cases, the compressor
must be replaced, but keep in mind that
this
replacement
is
not
enough.
It is always important to locate and
eliminate the cause(s) of the failure(s).
Mechanic Breakdown
If the compressor has no service valves,
transfer the refrigerant to an appropriate
cylinder, perform a pressurization test
(maximum 200 psig to protect low
pressure regulator), make new vacuum,
refrigerant load and new start with all
readings. Correct the installation to solve
any problems that have affected the
equipment,
releasing it
to normal
operation and always perform follow-up
useing the services of a qualified
company. In case the compressor has
service valves, the refrigerant can remain
in the circuit.
1.1. Turn the compressor electric
circuitry off and remove electric cables
(mark them);
1.2. Close compressor suction and
discharge valves;
1.3. Remove the welding in the
connections of the compressor to
suction and discharge pipes;
1.4. Remove the compressor;
1.5. Install the new compressor
1.6. Install the electric circuitry and
pressure regulator tails;
1.7. Evacuate the compressor;
1.8. Open compressor valves.
Motor Burnout
The motor burnout results in the
production of acids and deposition of oxi-
des and sludge in parts of the circuitry.
Thus, it is necessary to replace the
refrigerant and the oil, as well as to
clean all circuit and place HH antiacid
dryer filters in liquid and suction lines. In
this case, cleaning should proceed as
follows:
2.1. Collect all refrigerant in a cylinder
and send it to the manufacturer for
recycling, or recycle it using appropriate
equipment.
IMPORTANT
The follow-up of a perfect evacuation
must be performed using proper
equipment, and never measured in
relation to evacuation time, but in
reference to negative pressure: 250
to 500 microns.
2.2. Remove the compressor;
2.3. Remove the dryer filter;
2.4. Install the adequate filter in the com-
pressor suction line and replace the one
in the liquid line;
2.5. Install the new or recovered com-
pressor, evacuate and load the system;
2.6. Check contactors for cleaness.
If required, replace them;
2.7. Start the equipment and observe its
operation;
2.8. Verify pressure loss through the
suction filter.
If it
exceedes
the
manufacturer-recommended
value,
replace the filter;
2.9. After 24-hour operation, analyze oil;
2.10. Change oil and filters every 48
hours until oil is free of acidity;
2.11. Remove the suction filter.
When cleaning a circuit with two
compressors, replace burnout compres-
sor oil and its pair.
Leakage tests with nitrogen
The leakage test should be performed
after the installation of interconnection
tubing of separated units, whenever the
liquid sight glass shows bubbling or after
reparis in the equipment refrigerating
circuit.
Use refrigerant as a test element to
detect leakage and dry nitrogen to
achieve the test pressure.
WARNING!
Never release gas into the environ-
ment; always use appropriate
equipment.
Evacuation
- Evacuation is required to remove water
steam and non-condensable gases from
the system;
- Use rotary style high vacuum pump;
- Install the set manometer-manifold.
- A vaccum of at least one hour is
recommended to perform the first
reading.
The
evacuation
is
only
completed when the final vacuum is
between 250 and 500 microns. As a
release test, the pump register should
be closed for 5 minutes and the vacuum
should not exceed 100 microns.
WARNING!
Under no circumstances use oxygen
or acetylene instead of dry nitrogen to
test leakage. Undue use of such
gases may have fatal consequences,
as explosions, chemical reactions or
other reactions can occur.
WARNING!
Always use pressure regulator valve
in the dry nitrogen cylinder to test
leakage. If this valve is not used, there
may be fatal consequences due to
explosion.
Содержание TRCE050 1C
Страница 17: ...SSC SVN008E EN 17 Fig VII 03 Wiring Diagram ofstrength and command TRAE 050 TRAE Wiring Diagram...
Страница 18: ...18 SSC SVN008E EN Fig VII 04 Wiring Diagram of strength and command TRAE 100 1 circuit TRAE Wiring Diagram...
Страница 19: ...SSC SVN008E EN 19 Fig VII 05 Wiring Diagram of strength and command TRAE 050 1 circuit TRAE Wiring Diagram...
Страница 20: ...20 SSC SVN008E EN Fig VII 06 Wiring Diagram of strength and command TRAE 150 1 circuit TRAE Wiring Diagram...
Страница 21: ...SSC SVN008E EN 21 Fig VII 07 Wiring Diagram ofstrength and command TRAE 050 with RTRM TRAE Wiring Diagram...
Страница 22: ...22 SSC SVN008E EN Fig VII 08 Wiring Diagram of strength and command TRAE 200 250 1 circuit Wiring Diagram TRAE...
Страница 23: ...SSC SVN008E EN 23 Fig VII 09 Wiring Diagram ofstrength and command TRAE 050 With RTRM Wiring Diagram TRAE...
Страница 24: ...24 SSC SVN008E EN Fig VII 10 Wiring Diagram of strength and command TRAE 200 2 circuits Wiring Diagram TRAE...
Страница 26: ...26 SSC SVN008E EN Wiring Diagram TRAE Fig VII 12 Wiring Diagram of strength and command TRAE 250 2 circuits...
Страница 27: ...SSC SVN008E EN 27 Wiring Diagram TRAE Fig VII 13 Wiring Diagram of strength and command TRAE 100 1 circuit...
Страница 28: ...28 SSC SVN008E EN Fig VII 14 Wiring Diagram of strength and command TRAE 300 2 circuits Wiring Diagram TRAE...
Страница 37: ...SSC SVN008E EN 37 Fig VII 21 Wiring Diagram of strength and command TRAE 150 1 circuit Wiring Diagram TRAE RTRM...
Страница 40: ...40 SSC SVN008E EN Fig VII 23 Wiring Diagram ofstrength and command TRAE 150 2 circuits Wiring Diagram TRAE RTRM...
Страница 59: ...SSC SVN008E EN 59 Fig VII 36 Layout TRAE Standard with RTRM D1539 2083 01B1 Wiring Diagram Layout TRAE RTRM...
Страница 60: ...60 SSC SVN008E EN TRAE Fig VII 37 Layout TRAE 200 250 D1539 2083 01B Wiring Diagram Layout...
Страница 61: ...SSC SVN008E EN 61 TRAE Wiring Diagram Layout Fig VII 38 Layout TRAE 200 250 2 circuits...
Страница 62: ...62 SSC SVN008E EN TRAE Wiring Diagram Layout Fig VII 39 Layout TRAE 200 250 1 circuit...
Страница 64: ...64 SSC SVN008E EN Fig VII 40 Wiring DiagramTRCE 100 1 circuit Wiring Diagram TRCE...
Страница 65: ...SSC SVN008E EN 65 TRCE Wiring Diagram Fig VII 41 Wiring DiagramTRCE 150 1 circuit...
Страница 67: ...SSC SVN008E EN 67 Fig VII 43 Wiring Diagram TRCE Standard RTRM 100 1 circuit TRCE RTRM Wiring Diagram...
Страница 68: ...68 SSC SVN008E EN Fig VII 44 Wiring Diagram TRCE Standard RTRM 150 1 circuit TRCE RTRM Wiring Diagram...
Страница 69: ...SSC SVN008E EN 69 Fig VII 45 Wiring Diagram TRCE Standard RTRM 100 150 1 circuit TRCE RTRM Wiring Diagram...
Страница 71: ...SSC SVN008E EN 71 Fig VII 47 Wiring DiagramTRCE RTRM 100 1 circuit Wiring Diagram TRCE RTRM...
Страница 72: ...72 SSC SVN008E EN Wiring Diagram TRCE RTRM Fig VII 48 Wiring DiagramTRCE RTRM 150 1 circuit...
Страница 73: ...SSC SVN008E EN 73 Wiring Diagram TRCE Fig VII 49 Wiring Diagram TRCE 050 075 100 125 Standard...
Страница 74: ...74 SSC SVN008E EN Fig VII 50 Wiring Diagram TRCE050 075 100 125 150 RTRM Wiring Diagram TRCE RTRM...
Страница 75: ...SSC SVN008E EN 75 Wiring Diagram TRCE Fig VII 51 Wiring Diagram TRCE100 1 CIRCUIT Standard...
Страница 76: ...76 SSC SVN008E EN Fig VII 52 Wiring Diagram TRCE150 1 CIRCUIT Standard Wiring Diagram TRCE...
Страница 77: ...SSC SVN008E EN 77 Wiring Diagram TRCE RTRM Fig VII 53 Wiring Diagram TRCE150 1 CIRCUIT Standard...
Страница 78: ...78 SSC SVN008E EN Wiring Diagram TRCE RTRM Fig VII 54 Wiring Diagram TRCE150 1 CIRCUIT Standard...
Страница 80: ...80 SSC SVN008E EN Wiring Diagram Fig VII 57 Wiring Diagram EvaporatorUnit Condensing Unit TRAE TRCE...
Страница 85: ...SSC SVN008E EN 85 Fig VIII 07 Dimensions Condensing Units TRAE 150 2 circuits TRAE Dimensional Data...
Страница 86: ...86 SSC SVN008E EN Fig VIII 09 Dimensions Condensing Units TRAE 200 1 Circuit TRAE Dimensional Data...
Страница 87: ...SSC SVN008E EN 87 TRAE Dimensional Data Fig VIII 10 Dimensions Condensing Units TRAE 200 2 Circuits...
Страница 88: ...88 SSC SVN008E EN TRAE Dimensional Data Fig VIII 11 Dimensions Condensing Units TRAE 250 1 Circuit...
Страница 89: ...SSC SVN008E EN 89 TRAE Dimensional Data Fig VIII 12 Dimensions Condensing Units TRAE 250 2 Circuits...
Страница 90: ...90 SSC SVN008E EN TRAE Dimensional Data Fig VIII 13 Dimensions Condensing Units TRAE 300 2 Circuits...