background image

3270 3403 D

2

Frame-mounted Tracer™ AH541 Controller

Operating Environment Requirements

Make sure that the operating environment conforms to the specifications listed in 

Table 1

Enclosure Requirements

Before installing the frame-mounted controller, ensure that the enclosure or mounting space meets the following 
minimum requirements:

Minimum clearance (shown in the illustration below)

24 Vac dedicated power supply

Compliance with National Electrical Code™ (NEC) and applicable local electrical codes for high-voltage power wiring 
to the enclosure

Figure 1.

Minimum clearances

Table 1.

Specifications

Temperature:

From -40°F to 158°F (-40°C to 70°C)

Humidity:

5–95% non-condensing

Power requirements:

21–27 Vac (24 Vac nominal)

Altitude:

6500 ft (2000 m)

Installation:

Category 3

Pollution:

Degree 2

BO5

BO4

BO3

BO2

BO1

BO6

24VAC

AO4

AO3

AO6

AO5

AO2

IN3

IN2

IN1

AO1

IN6

IN7

IN5

IN11
IN12

IN10

IN9

IN8

IN4

1/2 in. (13 mm)

1/2 in. (13 mm)

6 in. (152 mm)
(For I/O wires)

1/2 in. (13 mm)

Содержание Tracer AH541

Страница 1: ...ed by the manufacturer Failure to do so may result in equipment damage Warnings Cautions and Notices Warnings cautions and notices are provided in appropriate places throughout this document WARNING Indicates a potentially hazardous situation which if not avoided could result in death or serious injury CAUTION Indicates a potentially hazardous situation which if not avoided may result in minor or ...

Страница 2: ...ion below 24 Vac dedicated power supply Compliance with National Electrical Code NEC and applicable local electrical codes for high voltage power wiring to the enclosure Figure 1 Minimum clearances Table 1 Specifications Temperature From 40 F to 158 F 40 C to 70 C Humidity 5 95 non condensing Power requirements 21 27 Vac 24 Vac nominal Altitude 6500 ft 2000 m Installation Category 3 Pollution Degr...

Страница 3: ...late mark the location of the four mounting holes and the grounding screw on the mounting surface 3 Set aside the controller and then drill holes for 8 4 mm screws at the marked locations 4 Drill a 1 8 inch diameter pilot hole for the supplied grounding screw 5 Secure the controller to the mounting surface with the enclosed using 8 4 mm screws not supplied in the mounting holes Figure 2 Dimensions...

Страница 4: ...e installed The board can be kept in the office and programmed while the enclosure is mounted and wired After programming has been completed connect the circuit board to the termination board To begin verify that the 24 Vac power cable is not connected to the termination board and then install the main circuit board as shown in Figure 3 p 5 ...

Страница 5: ...th the mounting locks on the bottom frame and then push the two frames together in the direction indicated by the arrows Note You will hear a click when the frames connect For controllers with an operator display connect the operator display cable to the circuit board 4 Install the supplied grounding screw 6 32 x 2 inch thread rolling screws into the assembly and turn it into the sheet metal backi...

Страница 6: ...ul MN 55110 USA Product name Tracer AH541modular configurable controller Model numbers BMTA000BAB00 BMTA000BAB01 BMTA000CAB00 Electromagnetic emission by Council directive 89 336 EEC EN61000 6 4 2001 Radiated EN61000 3 2 Conducted EN61000 3 3 Amendment A14 2000 1995 Class B limit 1995 Class B limit Electromagnetic immunity by Council directive 89 336 EEC EN61000 6 2 1999 IEC 1000 4 2 1995 EN61000 ...

Отзывы: