Trane RAUT 250 Скачать руководство пользователя страница 1

DECEMBER 2021

 

RAUT-IOM-R410A

690883980001

Confidential and proprietary Trane information

SAFETY WARNING

Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of 

heating, ventilating, and air-conditioning equipment can be hazardous and requires specific knowledge and training. 

Improperly installed, adjusted or altered equipment by an unqualified pers on could result in death or serious injury. 

When working on the equipment,  observe all precautions in the literature and on the tags, stickers, and labels that are 

attached to the equipment.

RAUT - Commercial

Installation Operation
Maintenance

Split System
Condensing Units
20-55 Tons

R410A

Models

RAUT 250
RAUT 300

RAUT 500
RAUT 600

RAUT 400

Содержание RAUT 250

Страница 1: ...n be hazardous and requires specific knowledge and training Improperly installed adjusted or altered equipment by an unqualified person could result in death or serious injury When working on the equi...

Страница 2: ...No 11 Minor Major Design Sequence Comp Motor A Modular RAUT Design Digit No 12 Factory Installed 0 No Option A Corrosion Resistant Coated Fin Blue Fin B Hydrophobic Coating Fin C Copper Fin and Coppe...

Страница 3: ...Contents Model Nomenclature System Precaution General Information General Data Installation Operation Maintenance Maintenance Compressor Trouble Analysis Dimensional Data Electrical Wiring 2 4 5 6 7 1...

Страница 4: ...ing leakage of water etc Be sure to cut off the main power in case of setting up the indoor electronic control P C board or wiring works It could cause an electri shock Any presence of foreign substan...

Страница 5: ...mail Notify the local Trane Sales Office Concealed damage must be reported within 15 days delivery Check the unit nameplate to confirm that the proper unit was shipped Available power supply must be c...

Страница 6: ...00 26 100 29 000 49 500 29 000 49 500 Vendor Motor Type 710W 710W 900W 1800W 1800W Qty 2 2 2 2 2 Speed RPM 920 920 920 720 720 V ph Hz 380 3 50 380 3 50 380 3 50 380 3 50 380 3 50 RLA LRA each A 3 22...

Страница 7: ...le of handling the weight of the unit Table 1 Clearances Provide sufficient clearance around the unit for performance of service and maintenance Caution unit operation is a function of the air tempera...

Страница 8: ...t and dry nitrogen for leak testing a violent explosion may result 3 Always use a pressure regulator valves and gauges to control drum and line pressures when pressure testing the system Excessive pre...

Страница 9: ...ety 2 Use copper conductors only for installation wiring Unit terminals are not designed to accept other type of wiring The use of aluminium wire may cause galvanic corrosion and or overheating at the...

Страница 10: ...er full load in the compressor oil level sight glass The unit was charged with the proper amount of oil before shipping Under normal operation compressor oil is always expected to return to compressor...

Страница 11: ...e 3B EXPANSION VALVE CAPILLARY TUBES SIGHT GLASS STRAINER LIQUID LINE FROM RECEIVER EXPANSION VALVE SOLENOID LIQUID VALVE EXPANSION VALVE EXPANSION VALVE THERMAL BULBS EXPANSION VALVE EQUALIZER LINES...

Страница 12: ...recommended procedures The following procedures should be carried out by a qualified service technician as part of a maintenance contract The first and last visit will include the seasonal shut down...

Страница 13: ...ction filter is required install it a minimum of 18 upstream of the compressor manifold piping See Figure 4 Caution Altering the original manifold piping may cause oil compressor failure This sequence...

Страница 14: ...line but not on motor side or fuse Voltmeter does not read proper voltage Motor starter holding coil is not energized Compressor will not operate Open contact on high pressure switch Discharge pressu...

Страница 15: ...obable cause Insufficient oil charge Clogged filter drier Liquid flooding back to compressor Recommended action All oil Replace Readjust superheat setting and verify correct bulb mounting F Compressor...

Страница 16: ...Expansion valve opens too far a Adjust superheat and check flood back to compressor bulb attachment b Expansion valve stuck in open b Repair or replace position L Discharge pressure too high Problems...

Страница 17: ...00 1693 0 222 2 208 0 67 4 146 7 SUCTION CONNECTION 1 5 8 1786 0 LIQUID CONNECTION 5 8 99 5 1588 0 99 5 RECOMMANDED CLEARANCE 1070 821 0 RECOMMANDED CLEARANCE 1524 RECOMMANDED CLEARANCE 1524 RECOMMAND...

Страница 18: ...273 0 273 0 2206 0 1156 0 2380 3 RECOMMANDED CLEARANCE 1070 RECOMMANDED CLEARANCE 1524 464 0 183 0 578 0 297 1 128 0 SUCTION CONNECTION SIZE 1 5 8 LIQUID CONNECTION SIZE 5 8 RECOMMANDED CLEARANCE 152...

Страница 19: ...RAUT IOM R410A 19 Electrical Wiring RAUT250 400 Micro P 1 2...

Страница 20: ...20 RAUT IOM R410A Electrical Wiring RAUT250 400 Micro P 2 2...

Страница 21: ...RAUT IOM R410A 21 Electrical Wiring RAUT500 600 Micro P 1 2...

Страница 22: ...22 RAUT IOM R410A Electrical Wiring RAUT500 600 Micro P 2 2...

Страница 23: ...RAUT IOM R410A 23 Electrical Wiring RAUT250 400 with Carel pCO5 1 2...

Страница 24: ...t 1 ID10 J7 2 Low Pressure Switch Circuit 2 ID11 J7 3 High Pressure Switch Circuit 2 ID12 J7 4 Compressor 1 Overload Circuit 2 IDC9 J7 5 Common DI 9 12 ID13h J8 1 Not used ID13 J8 2 Compressor 2 Overl...

Страница 25: ...RAUT IOM R410A 25 Electrical Wiring RAUT500 600 with Carel pCO5 1 2...

Страница 26: ...t 1 ID10 J7 2 Low Pressure Switch Circuit 2 ID11 J7 3 High Pressure Switch Circuit 2 ID12 J7 4 Compressor 1 Overload Circuit 2 IDC9 J7 5 Common DI 9 12 ID13h J8 1 Not used ID13 J8 2 Compressor 2 Overl...

Страница 27: ...RAUT IOM R410A 27 Note...

Страница 28: ...ations without notice We are committed to using environmentally conscious print practices Trane by Trane Technologies NYSE TT a global climate innovator creates comfortable energy efficient indoor env...