18
RT-SVX074A-EN
Figure 12.
12.5 tons high efficiency – unit clearance and roof opening
CLEARANCE 36” (914 MM)
CLEARANCE
HORIZONTAL FLOW - 18” (457 MM)
DOWNFLOW 36” (914 MM)
TYPICAL ROOF OPENING
CLEARANCE 36” (914 MM)
CLEARANCE 48” (1219 MM)
CLEARANCE FROM
TOP OF UNIT 72”
63 3/16”
1605 MM
46”
1168 MM
46”
1168 MM
99 11/16”
2532 MM
Figure 13.
12.5 tons high efficiency – roof curb
56 3/8”
1432 MM
14”
356 MM
1 3/4”
44 MM
34 3/8”
873 MM
18 1/2”
470 MM
1”
25 MM
6 5/8”
168 MM
1”
25 MM
18 1/2”
470 MM
1”
25 MM
80 1/2”
2045 MM
83 7/8”
2130 MM
CL
EA
RA
NCE
36”
(914
MM
) FOR D
OWNF
LOW
CLEARANC
E 1
8” (4
57
MM)
FOR
HOR
IZ
ONT
AL
34 3/8”
873 MM
59 7/8”
1521 MM
60 3/8”
1534 MM
2”
51 MM
2”
51 MM
84 1/2”
2146 MM