General Unit Requirements
The checklist listed below is a summary of the steps
required to successfully install a commercial unit. This
checklist is intended to acquaint the installing personnel
with what is required in the installation process. It does not
replace the detailed instructions called out in the
applicable sections of this manual.
•
Check the unit for shipping damage and material
shortage; file a freight claim and notify appropriate
sales representative.
•
Verify correct model, options and voltage from unit
nameplate.
•
Verify that the installation location of the unit will
provide the required clearance for proper operation.
•
Assemble and install the roof curb (if applicable). Refer
to the latest edition of the curb installers guide that
ships with each curb kit.
•
Fabricate and install ductwork; secure ductwork to
curb.
•
Install pitch pocket for power supply through building
roof. (If applicable)
•
Rigging the unit.
•
Set the unit onto the curb; check for levelness.
•
Ensure unit-to-curb seal is tight and without buckles or
cracks.
•
Install and connect a condensate drain line to the
evaporator drain connection.
Factory Installed Economizer
•
Ensure the economizer has been pulled out into the
operating position. Refer to the economizer installers
guide for proper position and setup.
•
Install all access panels.
Temperature Limit Switch Usage for
Electric Heat Units
Units are factory shipped in the downflow discharge
configuration but can be field converted to a horizontal
discharge configuration. Some, but not all units require a
different TCO-A limit switch, which is wire tied near the
terminal block in the heater compartment if horizontal
discharge configuration is used.
Horizontal Discharge Conversion
(3 Through 5 Ton Units)
Note:
3 - 5 ton units supply cover to supply opening and
return cover to return opening.
Supplies Needed by Installer for Conversion: 3 oz. tube of
High Temperature RTV sealant. (500°F / 260°C: Similar to
Dow Corning 736)
Note:
Failure to use recommended sealant could result in
unit performance loss.
If a unit is to be converted to a Horizontal discharge, the
following conversion must be performed:
1.
Remove RETURN and SUPPLY duct covers.
2. Locate supply cover. Apply ¼ in. (6mm.) continuous
bead of 500°F RTV sealant to the flange as shown.
3. Position duct cover as shown, rotate 90 degrees to
allow entrance into supply opening.
4. Slide duct covers into duct openings until inward edge
of duct cover engages with the 2 retaining clips on the
duct flanges. Secure the outward edge of each duct
cover with 2 screws.
5. Slide RETURN DUCT COVER (insulation side up) into
supply opening until inward edge of duct cover
engages with the 2 retaining clips on the duct flange.
Secure outward edge of the duct cover with two
screws.
Note:
Certain unit/electric heater combinations require a
limit switch change out for horizontal airflow
applications. Refer to the following instructions to
determine if this process is required for the unit
undergoing installation.
Horizontal Discharge Conversion
(6 Through 10 Ton Units)
Note:
6 - 10 ton units the supply cover to return opening
& return cover to supply opening.
Supplies Needed by Installer for Conversion: 3 oz. tube of
high Temperature RTV sealant. (500°F / 260°C: Similar to
Dow Corning 736)
Note:
Failure to use recommended sealant could result in
unit performance loss.
If a unit is to be converted to a Horizontal discharge, the
following conversion must be performed:
1.
Remove RETURN and SUPPLY duct covers.
2. Place SUPPLY DUCT COVER over down-flow return
opening. (insulation side down)
3. Using self-drilling screws, (or screws removed from
duct cover), screw through dimples to attach DUCT
COVER to base.
Figure 26.
Supply duct cover
RTV Sealant
Содержание Precedent THC036E
Страница 37: ...Installation RT SVX22J EN 37 Figure 51 Examples...
Страница 63: ......