![Trane L8X1B060U3XSAA Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/trane/l8x1b060u3xsaa/l8x1b060u3xsaa_installers-manual_1149964026.webp)
26
18-CE07D1-1C-EN
Table 3. Supply Duct Connections
Upflow Furnace with Coil
1.
Bend furnace flanges up.
2.
Set the coil on top of the furnace.
3.
Screw through the coil cabinet into the furnace flange. Guide
holes are located on the coil.
4.
Seal per local codes and requirements.
Furnace in Horizontal Left with Coil
1.
Bend furnace flanges up.
2.
Support the furnace and coil independently.
3.
Screw through the coil cabinet into the furnace flange. Guide
holes are located on the coil.
4.
Seal per local codes and requirements.
Содержание L8X1B060U3XSAA
Страница 12: ...12 18 CE07D1 1C EN Outline Drawings Table 2 17 5 Width Cabinet...
Страница 45: ...18 CE07D1 1C EN 45 N No ot te es s...
Страница 46: ...46 18 CE07D1 1C EN N No ot te es s...
Страница 47: ...18 CE07D1 1C EN 47 N No ot te es s...