RT-SVX24Q-EN
47
Figure 21.
Ductwork conversion
See Detail A
Detail A
Vertical Support
Align Gasket
To Base Rail
Surface
Gasket
1/4” Thick x 1” Wide
Gasket to Butt Up to
Vertical Support Surface
Typical Both Sides
Vertical Support/Base Rail Bottom
Gasket Application Details
Base Rail
Unit Rigging and Placement
W
WA
AR
RN
NIIN
NG
G
H
He
ea
av
vy
y O
Ob
bjje
ecctt!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w cco
ou
ulld
d rre
essu
ulltt iin
n
u
un
niitt d
drro
op
pp
piin
ng
g w
wh
hiicch
h cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr
sse
erriio
ou
uss iin
njju
urry
y,, a
an
nd
d e
eq
qu
uiip
pm
me
en
ntt o
orr p
prro
op
pe
errtty
y--o
on
nlly
y
d
da
am
ma
ag
ge
e..
E
En
nssu
urre
e tth
ha
att a
allll tth
he
e lliiffttiin
ng
g e
eq
qu
uiip
pm
me
en
ntt u
usse
ed
d iiss
p
prro
op
pe
errlly
y rra
atte
ed
d ffo
orr tth
he
e w
we
eiig
gh
htt o
off tth
he
e u
un
niitt b
be
eiin
ng
g
lliifftte
ed
d.. E
Ea
acch
h o
off tth
he
e cca
ab
blle
ess ((cch
ha
aiin
nss o
orr sslliin
ng
gss)),, h
ho
oo
okkss,,
a
an
nd
d ssh
ha
acckklle
ess u
usse
ed
d tto
o lliifftt tth
he
e u
un
niitt m
mu
usstt b
be
e cca
ap
pa
ab
blle
e
o
off ssu
up
pp
po
orrttiin
ng
g tth
he
e e
en
nttiirre
e w
we
eiig
gh
htt o
off tth
he
e u
un
niitt.. L
Liiffttiin
ng
g
cca
ab
blle
ess ((cch
ha
aiin
nss o
orr sslliin
ng
gss)) m
ma
ay
y n
no
ott b
be
e o
off tth
he
e ssa
am
me
e
lle
en
ng
gtth
h.. A
Ad
djju
usstt a
ass n
ne
ecce
essssa
arry
y ffo
orr e
ev
ve
en
n u
un
niitt lliifftt..
1. To configure the unit Center-of-Gravity, utilize
TOPSS or contact the local Trane sales office.
2. Attach adequate strength lifting slings to all lifting
lugs. The figures beginning with
show the minimum distance between the lifting
hook and the top of the unit and illustrate the
installation of spreader bars to protect the unit and
to facilitate a uniform lift. lists typical approximate
minimal unit operating weights. To determine
additional component weight, see .
3. Test lift the unit to ensure it is properly rigged and
balanced, make any necessary rigging adjustments.
4. Lift the unit and position it over the curb and
pedestal. These units have a continuous base rail
around the air handler section which matches the
curb.
IIm
mp
po
orrtta
an
ntt:: For replacements, remove old gasket
from the roof curb and place new
gasket material on curb. See
“,”
to
determine gasket material length using
roof curb dimensions.
5. Align the base rail of the unit air handler section
with the curb rail while lowering the unit onto the
curb. Make sure that the gasket on the curb is not
damaged while positioning the unit. (The pedestal
simply supports the unit condenser section)
A cross section of the juncture between the unit and
the roof curb is shown below.
Figure 22.
Curb cross section
Gasket
Base Pan
Lifting
Lug
14 1/16
1 13/16
2
1/2
2”x4”
Содержание IntelliPak 2 Series
Страница 217: ...RT SVX24Q EN 217 N No ot te es s...
Страница 218: ...218 RT SVX24Q EN N No ot te es s...
Страница 219: ...RT SVX24Q EN 219 N No ot te es s...