38
MUA-SVX004B-EN
Start-Up
Before starting the rooftop gas heating unit, use the “Installation Check Sheet” (found at the end
of this manual) in conjunction with the procedures outlined below to ensure that the unit is
completely and properly installed and ready for start-up.
1. Inspect all wiring connections; connections should be clean and tight.
2. Trace circuits to ensure that actual wiring agrees with the “as wired” diagrams provided with
the unit. Information in the title block of the wiring diagram(s) should match the data
appearing on the unit nameplate.
3. Verify that the system switch is in the OFF position.
4. Check unit supply voltage to ensure that it is within the utilization range.
5. Inspect the interior of the unit; remove any debris or tools which may be present.
Starting Unit In Heating Mode
W
WA
AR
RN
NIIN
NG
G
H
Ha
azza
arrd
do
ou
uss V
Vo
olltta
ag
ge
e!!
F
Fa
aiillu
urre
e tto
o d
diisscco
on
nn
ne
ecctt p
po
ow
we
err b
be
effo
orre
e sse
errv
viicciin
ng
g cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y..
D
Diisscco
on
nn
ne
ecctt a
allll e
elle
eccttrriicc p
po
ow
we
err,, iin
nccllu
ud
diin
ng
g rre
em
mo
otte
e d
diisscco
on
nn
ne
eccttss b
be
effo
orre
e sse
errv
viicciin
ng
g.. F
Fo
ollllo
ow
w
p
prro
op
pe
err llo
occkko
ou
utt//tta
ag
go
ou
utt p
prro
occe
ed
du
urre
ess tto
o e
en
nssu
urre
e tth
he
e p
po
ow
we
err cca
an
n n
no
ott b
be
e iin
na
ad
dv
ve
errtte
en
nttlly
y
e
en
ne
errg
giizze
ed
d.. V
Ve
erriiffy
y tth
ha
att n
no
o p
po
ow
we
err iiss p
prre
esse
en
ntt w
wiitth
h a
a v
vo
ollttm
me
ette
err..
1. Close the unit disconnect switch(s) that provide current to the unit control panel.
2. Set the room thermostat/switching subbase as indicated below:
a. Position the heating system switch at either HEAT or AUTO;
b. Set the fan switch at AUTO; and,
c. Adjust the temperature control setting to some point above room temperature.
3. Place the system switch in the ON position.
N
No
otte
e:: With the thermostat calling for heating, unit operation is automatic.
Final Checkout
Run the unit sequentially through its stages of heating. Once proper unit operation is verified,
perform these final steps:
1. Inspect the unit for debris and/or misplaced tools and hardware.
2. Be sure all gas valves and controls are in the operating position if the unit will be operating
immediately
3. Secure all exterior panels in place.