5
Section 3. Unit Preparation
3.1 Prepare The Unit For Installation
STEP 1
- Check for damage and report promptly to
the carrier any damage found to the unit.
Note:
If the unit must be transported in a horizontal
position, it must be laid on its back (marked “REAR”
on carton).
Note:
Remove the cardboard from the bottom of the
blower. Cut the tie wrap and remove the foam block
located at the motor.
Note:
After the unit is removed from the carton,
release pressure from the coil to verify coil is
pressurized and leak free.
3.2 Unit Accessories
Accessory Number
Description
Fits Cabinet Size
①
BAYECAA05LG1
Electric Heater, 5kW, Lugs, 24V Control, 1 Ph
A1
BAYECAA08LG1
Electric Heater, 8kW, Lugs, 24V Control, 1 Ph
A1
BAYECAA10LG1
Electric Heater, 10kW, Lugs, 24V Control, 1 Ph
A1
BAYSFSCABAA
Supply Duct Flange A1
①
A1
BAYRETFLGAA
Return Duct Flange A
A1
TASB175SB
④
Plenum Stand with integrated Sound Baffle 17.5” Cabinet
A1
BAYICSKIT01
Internal Condensate Switch (Upflow Orientation Only)
A1
BAYFRKIT100
Front Return Kit
A1
BAYBRFBX100
Bottom Return Filter Box
A1
BAYWMKIT001
Wall Mount Kit
A1
BAYLVKIT100
Low Voltage Conduit Entry Kit
A1
BAYATXV1836
R-22 TXV conversion kit 1-1/2 to 3 ton
A1
BAYSRKIT100
Side Return Kit
A1
BAYECPDKIT1
Pull Disconnect Kit
A1
BAYBAFKT175A
③
Baffle Kit 17.5” Cabinet
A1
BAYINSKT175A
Sound Insulation Kit
A1
BATCNDPIP01A
3/4” PVC Threaded Pipe Kit
A1
BAYFLR1620A
High Velocity Filter Kit, 16” x 20” x 1” (10 filters)
A1
TASSBK175
②④
Sound Baffle Kit 17.5” Cabinet
A1
MTISRKIT1620
④
Side Return Kit with 16"x20" Filter
A1
BAYCNDPIP01A
3/4” PVC Threaded Pipe Kit foam seal (10 per box)
A1
①
GAF2A0A36M Cabinet is one piece A1, 17.5” wide
②
Mounts to older TASB175 plenum stands with no integrated baffle
③
Mounts in air handler filter channel
④
Contact your distributor for information
Table 3.1