![Trane GAF2A0A36M31EC Скачать руководство пользователя страница 18](http://html.mh-extra.com/html/trane/gaf2a0a36m31ec/gaf2a0a36m31ec_installers-manual_1149567018.webp)
18
1.5” MIN
STEP 1
- Remove Heater, Coil, and Line Set panels.
Section 11. Refrigerant Line Brazing
11.1 Braze The Refrigerant Lines
STEP 6
- Connect, but do not braze, field line set to
indoor coil.
Allow a minimum of 1.5 inches of refrigerant line set
before using an elbow coupling.
Important:
Service access to the auxiliary heater
must remain unobstructed.
(See Section 2.2 Panel Removal)
Important:
Do NOT unseal coil refrigerant connection
stubs until ready to make connections.
Important:
Heat Sensitive Bulb.
The TXV sensing bulb must be removed or a wet rag
must be wrapped around the suction line between the
Bulb and the braze joint to protect the Bulb from failure
due to overheating.
Caution:
This coil is pressurized with 8-12 psig of dry
air. Do not stand directly in front of the coil connections
when removing sealing plugs.
Step 2
- Remove the sealing plug from the indoor coil
liquid connection.
NOTE:
A small amount of pressure should be re-
leased.
Heater
Panel
Line Set
Panel
Coil
Panel
1
2
3