Trane BAYSENS050m Скачать руководство пользователя страница 3

WARNING

Personal Protective Equipment (PPE) Required!

Failure to wear proper PPE for the job being undertaken could result in death or serious injury. 
Technicians, in order to protect themselves from potential electrical, mechanical, and chemical 
hazards, MUST follow precautions in this manual and on the tags, stickers, and labels, as well 
as the instructions below:

Before installing/servicing this unit, technicians MUST put on all PPE required for the work 
being undertaken (Examples; cut resistant gloves/sleeves, butyl gloves, safety glasses, hard 
hat/bump cap, fall protection, electrical PPE and arc flash clothing). ALWAYS refer to 
appropriate Safety Data Sheets (SDS) and OSHA guidelines for proper PPE.

When working with or around hazardous chemicals, ALWAYS refer to the appropriate SDS 
and OSHA/GHS (Global Harmonized System of Classification and Labeling of Chemicals) 
guidelines for information on allowable personal exposure levels, proper respiratory 
protection and handling instructions.

If there is a risk of energized electrical contact, arc, or flash, technicians MUST put on all PPE 
in accordance with OSHA, NFPA 70E, or other country-specific requirements for arc flash 
protection, PRIOR to servicing the unit. NEVER PERFORM ANY SWITCHING, 
DISCONNECTING, OR VOLTAGE TESTING WITHOUT PROPER ELECTRICAL PPE AND ARC 
FLASH CLOTHING. ENSURE ELECTRICAL METERS AND EQUIPMENT ARE PROPERLY RATED 
FOR INTENDED VOLTAGE.

WARNING

Follow EHS Policies!

Failure to follow instructions below could result in death or serious injury.

All Trane personnel must follow the company’s Environmental, Health and Safety (EHS) 
policies when performing work such as hot work, electrical, fall protection, lockout/tagout, 
refrigerant handling, etc. Where local regulations are more stringent than these policies, 
those regulations supersede these policies. 

Non-Trane personnel should always follow local regulations.

Introduction

ACC-SVN129D-EN

3

Copyright

This document and the information in it are the property of Trane, and may not be used or 
reproduced in whole or in part without written permission. Trane reserves the right to revise this 
publication at any time, and to make changes to its content without obligation to notify any person 
of such revision or change.

Trademarks

All trademarks referenced in this document are the trademarks of their respective owners. 

Revision History

Changed from 20 to 25 ton split system unit support.

Clarified installation instructions.

Document format update. 

Warning/caution/notice format update.

Содержание BAYSENS050m

Страница 1: ... equipment The installation starting up and servicing of heating ventilating and air conditioning equipment can be hazardous and requires specific knowledge and training Improperly installed adjusted or altered equipment by an unqualified person could result in death or serious injury When working on the equipment observe all precautions in the literature and on the tags stickers and labels that a...

Страница 2: ...d personnel Improperly installed and grounded field wiring poses FIRE and ELECTROCUTION hazards To avoid these hazards you MUST follow requirements for field wiring installation and grounding as described in NEC and your local state electrical codes Failure to follow code could result in death or serious injury WARNING Hazardous Voltage w Capacitors Failure to disconnect power and discharge capaci...

Страница 3: ...irements for arc flash protection PRIOR to servicing the unit NEVER PERFORM ANY SWITCHING DISCONNECTING OR VOLTAGE TESTING WITHOUT PROPER ELECTRICAL PPE AND ARC FLASH CLOTHING ENSURE ELECTRICAL METERS AND EQUIPMENT ARE PROPERLY RATED FOR INTENDED VOLTAGE WARNING Follow EHS Policies Failure to follow instructions below could result in death or serious injury All Trane personnel must follow the comp...

Страница 4: ...troduction InstallationKit The installation kit includes the following Wireless Receiver Wireless Zone Sensor Wire Harness Mounting Bracket Two 8 32 x Pan Head Screws Two 6 32 x Pan Head Screws Two 10 32 x Pan Head Screws ...

Страница 5: ...t holes in the right hand back corner of the control box floor Use the two 8 32 x 1 2 screws to mount the bracket to the Odyssey control box See Figure 3 10 12 ton split system units If the control box does not have pre drilled holes to mount the bracket using a 29 drill Diameter 0 136 hole drill two engagement holes in the front edge of the control box floor Use the two 8 32 x 1 2 screws to mount...

Страница 6: ...Figure 2 3 10 Ton Packaged Rooftop Units Figure 3 6 7 Ton Split System Units 6 ACC SVN129D EN Installation ...

Страница 7: ...Figure 4 10 12 Ton Split System Units Figure 5 15 25 Ton Split System Units ACC SVN129D EN 7 Installation ...

Страница 8: ...Table 1 Table 1 Wire Label RTRM J6 Termination ZONE J6 1 GND SIGNAL J6 2 SETPOINT J6 3 FAN SYSTEM J6 4 HEAT SETPOINT J6 5 24 VAC DC J6 14 GND POWER J6 6 9 Check all connections Once connections are verified correct reapply power to the unit and UCM 10 Refer to the Wireless Sensor Installation Operation and Maintenance BAS SVX04 EN document to associate the receiver with the Wireless Display Sensor...

Страница 9: ......

Страница 10: ......

Страница 11: ......

Страница 12: ...cations without notice We are committed to using environmentally conscious print practices Trane and American Standard create comfortable energy efficient indoor environments for commercial and residential applications For more information please visit trane com or americanstandardair com ACC SVN129D EN 05 Jun 2020 Supersedes ACC SVN129C EN Jan 2015 ...

Отзывы: