Trane BAYGARD311A Скачать руководство пользователя страница 4

4

RT-SVN039A-EN

W

WA

AR

RN

NIIN

NG

G

F

Fo

ollllo

ow

w E

EH

HS

S P

Po

olliicciie

ess!!

Failure to follow instructions below could result in death or serious injury.

All Trane personnel must follow the company’s Environmental,
Health and Safety (EHS) policies when performing work such as
hot work, electrical, fall protection, lockout/tagout, refrigerant
handling, etc. Where local regulations are more stringent than
these policies, those regulations supersede these policies.

Non-Trane personnel should always follow local regulations.

Copyright

This document and the information in it are the property of Trane, and may
not be used or reproduced in whole or in part without written permission.
Trane reserves the right to revise this publication at any time, and to make
changes to its content without obligation to notify any person of such
revision or change.

Trademarks

All trademarks referenced in this document are the trademarks of their
respective owners.

Содержание BAYGARD311A

Страница 1: ...installed adjusted or altered equipment by an unqualified person could result in death or serious injury When working on the equipment observe all precautions in the literature and on the tags sticke...

Страница 2: ...d chemicals that may affect the ozone layer are refrigerants that contain Chlorine Fluorine and Carbon CFCs and those containing Hydrogen Chlorine Fluorine and Carbon HCFCs Not all refrigerants contai...

Страница 3: ...d on the tags stickers and labels as well as the instructions below Before installing servicing this unit technicians MUST put on all PPE required for the work being undertaken Examples cut resistant...

Страница 4: ...regulations are more stringent than these policies those regulations supersede these policies Non Trane personnel should always follow local regulations Copyright This document and the information in...

Страница 5: ...ial Verify that the nameplate data matches the sales order and bill of lading Verify that the unit is properly equipped and there are no material shortages Verify that the power supply complies with t...

Страница 6: ...ards referred to in this installation guide are provided for use with Foundation 8 5 12 5 tons units Parts List Description Quantity Hail Guard A 51 75 X 44 00 1 Hail Guard B 40 50 X 43 94 1 Screws 10...

Страница 7: ...existing screws 3 Ensure that the provided screws and attachment locations are not going to penetrate the RTU coil 4 Use provided screws and attach Panel A and Panel B over respective coils See Figure...

Страница 8: ...formation please visit trane com or americanstandardair com Trane and American Standard have a policy of continuous product and product data improvement and reserve the right to change design and spec...

Отзывы: