background image

RT-SVN039A-EN

3

W

WA

AR

RN

NIIN

NG

G

P

Prro

op

pe

err F

Fiie

elld

d W

Wiirriin

ng

g a

an

nd

d G

Grro

ou

un

nd

diin

ng

g R

Re

eq

qu

uiirre

ed

d!!

Failure to follow code could result in death or serious injury.
All field wiring MUST be performed by qualified personnel. Improperly
installed and grounded field wiring poses FIRE and ELECTROCUTION
hazards. To avoid these hazards, you MUST follow requirements for field
wiring installation and grounding as described in NEC and your local/state/
national electrical codes.

W

WA

AR

RN

NIIN

NG

G

P

Pe

errsso

on

na

all P

Prro

otte

eccttiiv

ve

e E

Eq

qu

uiip

pm

me

en

ntt ((P

PP

PE

E)) R

Re

eq

qu

uiirre

ed

d!!

Failure to wear proper PPE for the job being undertaken could result in
death or serious injury.
Technicians, in order to protect themselves from potential electrical,
mechanical, and chemical hazards, MUST follow precautions in this manual
and on the tags, stickers, and labels, as well as the instructions below:

Before installing/servicing this unit, technicians MUST put on all
PPE required for the work being undertaken (Examples; cut
resistant gloves/sleeves, butyl gloves, safety glasses, hard hat/
bump cap, fall protection, electrical PPE and arc flash clothing).
ALWAYS refer to appropriate Safety Data Sheets (SDS) and OSHA
guidelines for proper PPE.

When working with or around hazardous chemicals, ALWAYS
refer to the appropriate SDS and OSHA/GHS (Global Harmonized
System of Classification and Labelling of Chemicals) guidelines
for information on allowable personal exposure levels, proper
respiratory protection and handling instructions.

If there is a risk of energized electrical contact, arc, or flash,
technicians MUST put on all PPE in accordance with OSHA, NFPA
70E, or other country-specific requirements for arc flash
protection, PRIOR to servicing the unit. NEVER PERFORM ANY
SWITCHING, DISCONNECTING, OR VOLTAGE TESTING
WITHOUT PROPER ELECTRICAL PPE AND ARC FLASH CLOTHING.
ENSURE ELECTRICAL METERS AND EQUIPMENT ARE PROPERLY
RATED FOR INTENDED VOLTAGE.

Содержание BAYGARD311A

Страница 1: ...installed adjusted or altered equipment by an unqualified person could result in death or serious injury When working on the equipment observe all precautions in the literature and on the tags sticke...

Страница 2: ...d chemicals that may affect the ozone layer are refrigerants that contain Chlorine Fluorine and Carbon CFCs and those containing Hydrogen Chlorine Fluorine and Carbon HCFCs Not all refrigerants contai...

Страница 3: ...d on the tags stickers and labels as well as the instructions below Before installing servicing this unit technicians MUST put on all PPE required for the work being undertaken Examples cut resistant...

Страница 4: ...regulations are more stringent than these policies those regulations supersede these policies Non Trane personnel should always follow local regulations Copyright This document and the information in...

Страница 5: ...ial Verify that the nameplate data matches the sales order and bill of lading Verify that the unit is properly equipped and there are no material shortages Verify that the power supply complies with t...

Страница 6: ...ards referred to in this installation guide are provided for use with Foundation 8 5 12 5 tons units Parts List Description Quantity Hail Guard A 51 75 X 44 00 1 Hail Guard B 40 50 X 43 94 1 Screws 10...

Страница 7: ...existing screws 3 Ensure that the provided screws and attachment locations are not going to penetrate the RTU coil 4 Use provided screws and attach Panel A and Panel B over respective coils See Figure...

Страница 8: ...formation please visit trane com or americanstandardair com Trane and American Standard have a policy of continuous product and product data improvement and reserve the right to change design and spec...

Отзывы: