INSTALLER'S GUIDE

STEP 8  - Connect high voltage wiring

1.    Connect the wiring to the lugs on the breaker models or 

to the terminal block on the lug models as illustrated.

2.    Connect the ground wire to the ground lug.
3.    Connect the 3-pin plug on the heater to the 3-pin plug in 

the air handler case.

Note: Minimum terminal screw torque is 45 in-lbs.

Field wiring

Factory wiring

Ground

Field  

wiring

Factory  

wiring

Ground

Breaker Model

LG (lug) Model

Factory  

wiring

Field  

wiring

BLK

BLK

RED

RED

GREEN

GREEN

STEP 9  - Install the seal plate.  Breaker models only.

1.    Place the seal plate over the breaker so the tab on the 

right side is in place. 

2.    Snap on the left side of the seal plate that has the slot 

by the tab. 

Place over 

breaker first

Snap in 

place over 

breaker 

second

Field  

wiring

Factory  

wiring

Ground

3-Phase Model

Factory  

wiring

Field  

wiring

BLK

RED

GREEN

Field  

wiring

Содержание BAYEVAC05BK1A

Страница 1: ...ounds of electrical and mechanical experience Any attempt to repair a central air conditioning product may result in personal injury and or property damage The manufacturer or seller cannot be respons...

Страница 2: ...sure the power supply matches the listing shown on the heater nameplate Section 2 General Information Section 3 Heater Assembly Labeled 8 10 kW breaker model illustrated Width Adjustment Brackets Hea...

Страница 3: ...lti poise 4 way M Product Tier Multi speed 7 Major Design Modifications Letter Sequence A No Descriptor Air Handler Coil 0 Size Footprint 17 5 x 21 5 A 21 0 x 21 5 B 23 5 x 21 5 C Cooling Size Air Han...

Страница 4: ...inimum Cabinet Width A B C A Maximum Cabinet Width A B C C Electric Heat Input Electric Heat kW 05 08 10 15 20 25 0 9 0 9 Connection Breaker B K Lugs L G Power Supply 208 230 1 60 1 200 1 50 A 208 230...

Страница 5: ...he cabinet size they match with for example the Filler Plate for cabinet B is marked B CAB 3 Tighten the Filler Plate screws loosened previously and add a screw provided to the bottom of each plate to...

Страница 6: ...rotated in order to comply with National Electric Code NEC Section 240 81 The NEC requires that circuit breakers operated verti cally must be oriented so that the on position of the breaker is upward...

Страница 7: ...LGA B or C Supply Duct Flange Kit install the kit before inserting the heater STEP 3 Insert heater assembly into heater compart ment 1 Move factory wiring out of the way and into the grooves provided...

Страница 8: ...to secure the factory supplied conduit nut from the inside of heater compartment 2 Connect field supplied 3 4 or 1 1 2 conduit to conduit nut Note Reducing bushings may be required for your applicati...

Страница 9: ...is 45 in lbs Field wiring Factory wiring Ground Field wiring Factory wiring Ground Breaker Model LG lug Model Factory wiring Field wiring BLK BLK RED RED GREEN GREEN STEP 9 Install the seal plate Bre...

Страница 10: ...PPLY PER LOCAL CODE EL EC TR IC HE AT CO NT RO L LO W VO LT AG E WI RING T11 T12 T1 T2 T3 T4 T5 T6 T7 T8 T9 T10 EHC IN AIR HA ND LE R GR GR BK RD 3 1 HIG H VOL TAG E WIR ING IN AIR HAN DLE R MOD EL BA...

Страница 11: ...LT S 208 VOLT S 4 80 20 4 80 20 3 6 1 7 3 3 6 17 3 C 4 80 20 3 6 1 7 3 CIRC UIT I CIRC UIT II 9 60 40 9 60 40 7 20 34 6 7 20 3 4 6 D 4 80 20 3 6 1 7 3 TOTA L HEAT ER RATI NGS KW A MPS RD RD RD RD RD R...

Страница 12: ...900 675 1 900 600 713 TAM8A0B30V21CB 723 808 723 1020 765 1020 680 808 765 1063 850 1105 TAM8A0C36V31CB 876 979 876 1236 927 1236 824 979 927 1288 1030 1339 1236 1442 TAM8A0C42V31CB 978 1093 978 1380...

Страница 13: ...f the jumper is moved to another kW rating and power is applied the factory programming on the PARK position is lost The jumper must then be applied to the appropriate rating per the heater model numb...

Страница 14: ...or by the kW jumper position 3 The AFC sends a command to the serial communicating blower motor to run proper airflow and close the blower interlock relay on the EHC 4 As demand from the thermostat i...

Страница 15: ...Page 15 INSTALLER S GUIDE...

Страница 16: ...Since the manufacturer has a policy of continuous product and product data improvement it reserves the right to change design and specification without notice Trane 6200 Troup Highway Tyler TX 75707...

Отзывы: