background image

Page 6

INSTALLER'S GUIDE

STEP 4 - (Optional) Rotate Circuit Breaker Assembly.

The need to reorient the Circuit Breaker Assembly 
depends upon the orientation of your application 
and which of the high voltage electrical conduit entry 
points you use for high voltage wiring.

SAFETY HAZARD! 

Sharp Edge Hazard. Be careful of 

sharp edges on equipment or any cuts made on sheet metal while 
installing or servicing. Personal injury may result.

CAUTION

!

1.    Unscrew the Breaker Bracket from the Base Plate 

using a magnetic 1/4" hex driver with an extension. 
The extension allows for easier access to the screws 
which are located at the back of the bracket. 

2.    Rotate the bracket with circuit breaker(s) 180 °. 
3.    Use the screws removed in action 2 (above) to secure 

the bracket to the Base Plate.

Note: For LG (lug) heater models the terminal block 
bracket does not rotate.

Important: For air handler units installed in the 
horizontal right position, the circuit breakers on 
the heater must be rotated in order to comply with 
National Electric Code (NEC Section 240.81). The 
NEC requires that circuit breakers operated verti-
cally must be oriented so that the "on" position of the 
breaker is upward. 

Field 

Connections

ON

Screw

Screw

Circuit 

Breaker

Breaker 

Bracket

Factory 

Connections

Circuit Breaker 

Assembly

STEP3 - Attach Retainer Tabs and Edge Guard

Note: For A cabinet widths, only the right side 
retainer tab must be installed.

1.    Add the Retainer tabs using the screws provided (both 

tabs and screws are located in the documentation 
packet).

    Leave the screws slightly loose so that the tab can slide 

to the left or right as needed. The tab will be used later 
to engage in a slot within the air handler cabinet.

Note: If no filler plates are needed, the retainer tabs 
must be attached to the heater coil flange.  Leave 
the screws slightly loose so they can be slid to the 
left or right as needed.

2.    The edge guard is located in the document pack.  Cut 

the edge guard to the length needed for the heater 
width, including the filler plates.

3.    Install the edge guard on the front of the heater flange 

as shown.

Rounded end  

inserts into cabinet

B and C 

Cabinet

A Cabinet

Содержание BAYEVAC05BK1A

Страница 1: ...ounds of electrical and mechanical experience Any attempt to repair a central air conditioning product may result in personal injury and or property damage The manufacturer or seller cannot be respons...

Страница 2: ...sure the power supply matches the listing shown on the heater nameplate Section 2 General Information Section 3 Heater Assembly Labeled 8 10 kW breaker model illustrated Width Adjustment Brackets Hea...

Страница 3: ...lti poise 4 way M Product Tier Multi speed 7 Major Design Modifications Letter Sequence A No Descriptor Air Handler Coil 0 Size Footprint 17 5 x 21 5 A 21 0 x 21 5 B 23 5 x 21 5 C Cooling Size Air Han...

Страница 4: ...inimum Cabinet Width A B C A Maximum Cabinet Width A B C C Electric Heat Input Electric Heat kW 05 08 10 15 20 25 0 9 0 9 Connection Breaker B K Lugs L G Power Supply 208 230 1 60 1 200 1 50 A 208 230...

Страница 5: ...he cabinet size they match with for example the Filler Plate for cabinet B is marked B CAB 3 Tighten the Filler Plate screws loosened previously and add a screw provided to the bottom of each plate to...

Страница 6: ...rotated in order to comply with National Electric Code NEC Section 240 81 The NEC requires that circuit breakers operated verti cally must be oriented so that the on position of the breaker is upward...

Страница 7: ...LGA B or C Supply Duct Flange Kit install the kit before inserting the heater STEP 3 Insert heater assembly into heater compart ment 1 Move factory wiring out of the way and into the grooves provided...

Страница 8: ...to secure the factory supplied conduit nut from the inside of heater compartment 2 Connect field supplied 3 4 or 1 1 2 conduit to conduit nut Note Reducing bushings may be required for your applicati...

Страница 9: ...is 45 in lbs Field wiring Factory wiring Ground Field wiring Factory wiring Ground Breaker Model LG lug Model Factory wiring Field wiring BLK BLK RED RED GREEN GREEN STEP 9 Install the seal plate Bre...

Страница 10: ...PPLY PER LOCAL CODE EL EC TR IC HE AT CO NT RO L LO W VO LT AG E WI RING T11 T12 T1 T2 T3 T4 T5 T6 T7 T8 T9 T10 EHC IN AIR HA ND LE R GR GR BK RD 3 1 HIG H VOL TAG E WIR ING IN AIR HAN DLE R MOD EL BA...

Страница 11: ...LT S 208 VOLT S 4 80 20 4 80 20 3 6 1 7 3 3 6 17 3 C 4 80 20 3 6 1 7 3 CIRC UIT I CIRC UIT II 9 60 40 9 60 40 7 20 34 6 7 20 3 4 6 D 4 80 20 3 6 1 7 3 TOTA L HEAT ER RATI NGS KW A MPS RD RD RD RD RD R...

Страница 12: ...900 675 1 900 600 713 TAM8A0B30V21CB 723 808 723 1020 765 1020 680 808 765 1063 850 1105 TAM8A0C36V31CB 876 979 876 1236 927 1236 824 979 927 1288 1030 1339 1236 1442 TAM8A0C42V31CB 978 1093 978 1380...

Страница 13: ...f the jumper is moved to another kW rating and power is applied the factory programming on the PARK position is lost The jumper must then be applied to the appropriate rating per the heater model numb...

Страница 14: ...or by the kW jumper position 3 The AFC sends a command to the serial communicating blower motor to run proper airflow and close the blower interlock relay on the EHC 4 As demand from the thermostat i...

Страница 15: ...Page 15 INSTALLER S GUIDE...

Страница 16: ...Since the manufacturer has a policy of continuous product and product data improvement it reserves the right to change design and specification without notice Trane 6200 Troup Highway Tyler TX 75707...

Отзывы: