RT-SVN037A-EN
3
W
WA
AR
RN
NIIN
NG
G
F
Fo
ollllo
ow
w E
EH
HS
S P
Po
olliicciie
ess!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w cco
ou
ulld
d rre
essu
ulltt iin
n
d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y..
••
A
Allll T
Trra
an
ne
e p
pe
errsso
on
nn
ne
ell m
mu
usstt ffo
ollllo
ow
w tth
he
e
cco
om
mp
pa
an
ny
y’’ss E
En
nv
viirro
on
nm
me
en
ntta
all,, H
He
ea
alltth
h a
an
nd
d S
Sa
affe
etty
y
((E
EH
HS
S)) p
po
olliicciie
ess w
wh
he
en
n p
pe
errffo
orrm
miin
ng
g w
wo
orrkk ssu
ucch
h a
ass
h
ho
ott w
wo
orrkk,, e
elle
eccttrriicca
all,, ffa
allll p
prro
otte
eccttiio
on
n,, llo
occkko
ou
utt//
tta
ag
go
ou
utt,, rre
effrriig
ge
erra
an
ntt h
ha
an
nd
dlliin
ng
g,, e
ettcc.. W
Wh
he
erre
e llo
occa
all
rre
eg
gu
ulla
attiio
on
nss a
arre
e m
mo
orre
e ssttrriin
ng
ge
en
ntt tth
ha
an
n tth
he
esse
e
p
po
olliicciie
ess,, tth
ho
osse
e rre
eg
gu
ulla
attiio
on
nss ssu
up
pe
errsse
ed
de
e tth
he
esse
e
p
po
olliicciie
ess..
••
N
No
on
n--T
Trra
an
ne
e p
pe
errsso
on
nn
ne
ell ssh
ho
ou
ulld
d a
allw
wa
ay
yss ffo
ollllo
ow
w
llo
occa
all rre
eg
gu
ulla
attiio
on
nss..
Copyright
This document and the information in it are the
property of Trane, and may not be used or reproduced
in whole or in part without written permission. Trane
reserves the right to revise this publication at any time,
and to make changes to its content without obligation
to notify any person of such revision or change.
Trademarks
All trademarks referenced in this document are the
trademarks of their respective owners.
Unit Inspection
To protect against loss due to damage incurred in
transit, perform inspection immediately upon receipt of
the unit.
Exterior Inspection
If the job site inspection reveals damage or material
shortages, file a claim with the carrier immediately.
Specify the type and extent of the damage on the bill of
lading before signing. Notify the appropriate sales
representative.
IIm
mp
po
orrtta
an
ntt:: Do not proceed with installation of a
damaged unit without sales
representative’s approval.
•
Visually inspect the complete exterior for signs of
shipping damages to unit or packing material.
•
Verify that the nameplate data matches the sales
order and bill of lading.
•
Verify that the unit is properly equipped and there
are no material shortages.
•
Verify that the power supply complies with the unit
nameplate specifications.
Inspection for Concealed Damage
Visually inspect the components for concealed damage
as soon as possible after delivery and before it is
stored.
If concealed damage is discovered:
•
Notify the carrier’s terminal of the damage
immediately by phone and by mail.
•
Concealed damage must be reported within 15
days.
•
Request an immediate, joint inspection of the
damage with the carrier and consignee.
•
Stop unpacking the unit.
•
Do not remove damaged material from receiving
location.
•
Take photos of the damage, if possible.
•
The owner must provide reasonable evidence that
the damage did not occur after delivery.
Parts List
•
2 Side rails
•
2 End rails
•
1 Side curb flange
•
1 End curb flange
•
4 Insulated block-off panels
•
Gasketing material
•
Sheet metal screws