5.1 Removing the FCCV
Note: The FCCV will be reused in the replace-
ment coil. DO NOT discard.
1) Disconnect the liquid line to remove the FCCV
from the fitting. Retain for later installation in
the new coil.
2) Using tubing cutters, cut copper tubing on
either side of fitting that held FCCV.
3) Remove fitting from coupling panel. The
new field fabricated liquid line will be routed
through this opening.
5.2 Remove the existing coil
5.3 Installing the FCCV into the
replacement coil
1) To install the metering device, remove the
outer sheet metal cover of the replacement
evaporator coil by taking out the screws
around the perimeter of the shield.
This will expose the short liquid line and dis-
tributor assembly of the replacement coil.
Retain the screws for re-attachment in a later
step (See Figure 2)
Note: Take care not to bend the coil distributor
lines. Use a backup wrench to prevent stress
on components. (See Figure 3)
2)
Remove the short liquid line from the new coil
distributor. (See Figure 4)
3) Install the FCCV into the distributor assembly
with orientation as shown. (See Figure 12)
4) Bolt the short liquid line to the distributor as-
sembly. (See Figure 3)
Note: Torque specification for TEV equals 1/6
turn past finger tight.
Section 5. Coil with a FCCV