STEP 4

 - Measure the liquid line temperature 

and pressure at the outdoor unit’s service valve.

Measured Liquid Line Temp = __________  º F

Liquid Gage Pressure = __________ PSIG

Final Subcooling Value = __________  º F

STEP 5

 - Use the final subcooling value, refriger-

ant temperature and pressure from STEP 4, to 
determine the proper liquid gage pressure using 
Table 14.2.

  Example: Assume a 12º F Final Subcooling 

value and liquid temp of 90º F.  

    1. Locate 12º F Final Subcooling in Table 14.2.
    2. Locate the Liquid Temperarature (90º F) in 

the left column.

    3. The Liquid Gage Pressure should be ap-

proximately 327 PSIG.  (This is the shown as 
the intersection of the Final Subcooling column 
and the Liquid Temperature row.

Table 14.2

8

9

10

11

12

13

14

179 182 185 188 191 195 198
195 198 201 204 208 211 215
211 215 218 222 225 229 232
229 232 236 240 243 247 251
247 251 255 259 263 267 271
267 271 275 279 283 287 291
287 291 296 300 304 309 313
309 313 318 322 327 331 336
331 336 341 346 351 355 360
355 360 365 370 376 381 386
381 386 391 396 402 407 413
407 413 418 424 429 435 441
435 441 446 452 458 464 470
464 470 476 482 488 495 501
495 501 507 514 520 527 533

R-410A REFRIGERANT CHARGING CHART

55
60
65
70
75
80
85
90
95

100
105
110
115
120
125

LIQUID

TEMP

(

°

F) 

FINAL SUBCOOLING (

°

F)

LIQUID GAGE PRESSURE (PSI)

From Dwg. D154557P01 Rev. 3

107 °F

Содержание 4TWA7

Страница 1: ...pproved matched indoor and outdoor systems All of the manufacture s split systems are AHRI rated only with TXV EEV indoor systems Some of the benefits of installing approved matched indoor and out doo...

Страница 2: ...ponent replacement For specific handling concerns with R 410A and POE oil reference Retrofit Bulletins SS APG006 EN and APP APG011 EN or APP APG012 EN Extreme caution should be exercised when opening...

Страница 3: ...sions and Weight Models H x D x W in Weight lb 4TWA7036A3 4 45 x 34 x 37 245 4TWA7048A3 4 45 x 34 x 37 265 4TWA7060A3 4 45 x 34 x 37 265 Weight values are estimated 1 The maximum TOTAL length of refri...

Страница 4: ...areas where snow accumulation and prolonged below freezing temperatures occur Units should be elevated 3 12 inches above the pad or roof top depending on local weather This additional height will all...

Страница 5: ...pad such as a concrete slab consider the following The pad should be at least 1 larger than the unit on all sides The pad must be separate from any structure The pad must be level The pad should be h...

Страница 6: ...4 7 8 3 8 7 8 3 8 150 50 4TWA7060A3 4 1 1 8 3 8 7 8 3 8 80 25 ALTERNATE LINE SIZES Line Sizes Service Valve Connection Sizes Max Line Lift Lengths Vapor Line Liquid Line Vapor Line Connection Liquid L...

Страница 7: ...line length and lift You will need this later in STEP 2 of Section 14 Total Line Length __________ Ft Total Vertical Change lift __________ Ft Trane outdoor condensing units are factory charged with...

Страница 8: ...rom the refrigerant lines For Example When the refrigerant lines have to be fastened to floor joists or other framing in a structure use isolation type hangers Isolation hangers should also be used wh...

Страница 9: ...e or other appropriate method every 8 ft 8 Feet Maximum Isolation Through Wall DO NOT hang line sets from ductwork Sealant Insulation Vapor Line Wall Ductwork Isolator Line Set Section 7 Refrigerant L...

Страница 10: ...ier check liquid line filter drier s directional flow arrow to confirm correct direction of refrigeration flow away from outdoor unit and toward evapo rator coil as illustrated Braze the filter drier...

Страница 11: ...2 Check for leaks by using a soapy solu tion or bubbles at each brazed location Remove nitrogren pressure and repair any leaks before continuing Section 8 Refrigerant Line Leak Check 8 1 Check For Le...

Страница 12: ...ete blank off the vacuum pump and micron gauge and close the valves on the manifold gauge set 1 MIN Section 10 Service Valves 10 1 Open the Gas Service Valve 0350 Microns ON OFF CAP 1 4 TURN ONLY COUN...

Страница 13: ...ve System Service Port 3 16 Hex Wrench Unit Side of Service Valve Extreme caution should be exercised when opening the Liquid Line Service Valve Turn counterclockwise until the valve stem just touches...

Страница 14: ...to the service information in control box Defrost Board Detail Jumper J2 J5 Test Pins 11 3 Defrost Control With TEM 6 Thermostat Air Handler Outdoor Unit R G B W1 W2 R B O X2 R G B C B C O Y1 W Blue...

Страница 15: ...gh Voltage Ground Ground the outdoor unit per national state and local code requirements LIVE ELECTRICAL COMPONENTS During installation testing servicing and troubleshooting of this product it may be...

Страница 16: ...s to apply power to the indoor and outdoor units STEP 5 Set system thermostat to ON OFF DONE CANCEL ON OFF STEP 4 Wait one 1 hour before starting the unit if compressor crankcase heater acces sory is...

Страница 17: ...ent tempera ture is above 55 F For best results the indoor temperature should be kept between 70 F to 80 F STEP 1 Use the refrigerant line total length and lift measurements from Section 5 3 Total Lin...

Страница 18: ...NG CHART CORRECTIONS TABLE FOR LINE LENGTH AND RISE Add 2 REFRIGERANT LINE LIFT FT 4 Ton Heat Pump 50 1 40 1 30 25 Use Design Subcooling 15 10 0 20 30 40 50 60 70 80 90 100 110 120 130 140 150 REFRIGE...

Страница 19: ...essure should be ap proximately 327 PSIG This is the shown as the intersection of the Final Subcooling column and the Liquid Temperature row Table 14 2 8 9 10 11 12 13 14 179 182 185 188 191 195 198 1...

Страница 20: ...OR TEMPERATURE Degree F SUCTION PRESSURE PSIG OUTDOOR TEMPERATURE Degree F COOLING PERFORMANCE CAN BE CHECKED WHEN THE OUTDOOR TEMP IS ABOVE 65 DEG F TO CHECK COOLING PERFORMANCE SELECT THE PROPER IND...

Страница 21: ...eating Only Measured Suction Line Temp __________ F Liquid Gage Pressure __________ PSIG Suction Gage Pressure __________ PSIG Calculating Charge Using the Weigh In Method 1 Measure in feet the distan...

Страница 22: ...btained with the namplate charge plus additional charge previously added STEP 5 Return to site for adjustment Important Return in the spring or summer to accurately charge the system in the cooling mo...

Страница 23: ...gainst the following list Final phases of this installation are the unit Operational and Checkout Procedures To obtain proper performance all units must be operated and charge adjustments made Importa...

Страница 24: ...A R G E E X C E S S I V E E V A P L O A D N O N C O N D E N S A B L E S R E S O D A I R F L O W O D A I R R E C I R C U L A T I O N T X V E E V S T U C K O P E N S U P E R H E A T R E S I D A I R F L...

Отзывы: