STEP 4

 - Measure the liquid line temperature 

and pressure at the outdoor unit’s service valve.

Measured Liquid Line Temp = __________  º F

Liquid Gage Pressure = __________ PSIG

Final Subcooling Value = __________  º F

STEP 5

 - Use the final subcooling value, refriger-

ant temperature and pressure from STEP 4, to 
determine the proper liquid gage pressure using 
Table 14.2.

  Example: Assume a 12º F Final Subcooling 

value and liquid temp of 90º F.  

    1. Locate 12º F Final Subcooling in Table 14.2.
    2. Locate the Liquid Temperarature (90º F) in 

the left column.

    3. The Liquid Gage Pressure should be ap-

proximately 327 PSIG.  (This is the shown as 
the intersection of the Final Subcooling column 
and the Liquid Temperature row.

Table 14.2

8

9

10

11

12

13

14

179 182 185 188 191 195 198
195 198 201 204 208 211 215
211 215 218 222 225 229 232
229 232 236 240 243 247 251
247 251 255 259 263 267 271
267 271 275 279 283 287 291
287 291 296 300 304 309 313
309 313 318 322 327 331 336
331 336 341 346 351 355 360
355 360 365 370 376 381 386
381 386 391 396 402 407 413
407 413 418 424 429 435 441
435 441 446 452 458 464 470
464 470 476 482 488 495 501
495 501 507 514 520 527 533

R-410A REFRIGERANT CHARGING CHART

55
60
65
70
75
80
85
90
95

100
105
110
115
120
125

LIQUID

TEMP

(

°

F) 

FINAL SUBCOOLING (

°

F)

LIQUID GAGE PRESSURE (PSI)

From Dwg. D154557P01 Rev. 3

107 °F

Содержание 4TTX8024A

Страница 1: ...y approved matched indoor and outdoor systems All of the manufacture s split systems are AHRI rated only with TXV EEV indoor systems Some of the benefits of installing approved matched indoor and out...

Страница 2: ...t replacement For specific handling concerns with R 410A and POE oil reference Retrofit Bulletins SS APG006 EN and APP APG011 EN or APP APG012 EN Extreme caution should be exercised when opening the L...

Страница 3: ...h of refrigerant lines from outdoor to indoor unit should NOT exceed 150 feet including lift 2 The maximum vertical change should not exceed 50 feet 3 Standard and alternate line sizes and service val...

Страница 4: ...oof top depending on local weather This additional height will allow drainage of snow and ice melted during defrost cycle prior to its refreezing Ensure that drain holes in unit base pan are not obstr...

Страница 5: ...pad such as a concrete slab consider the following The pad should be at least 1 larger than the unit on all sides The pad must be separate from any structure The pad must be level The pad should be h...

Страница 6: ...048A 7 8 3 8 7 8 3 8 150 50 4TTX8060A 1 1 8 3 8 7 8 3 8 150 50 ALTERNATE LINE SIZES Line Sizes Service Valve Connection Sizes Max Line Lift Lengths Vapor Line Liquid Line Vapor Line Connection Liquid...

Страница 7: ...mine required line length and lift You will need this later in STEP 2 of Section 14 Total Line Length __________ Ft Total Vertical Change lift __________ Ft The outdoor condensing units are factory ch...

Страница 8: ...rom the refrigerant lines For Example When the refrigerant lines have to be fastened to floor joists or other framing in a structure use isolation type hangers Isolation hangers should also be used wh...

Страница 9: ...e or other appropriate method every 8 ft 8 Feet Maximum Isolation Through Wall DO NOT hang line sets from ductwork Sealant Insulation Vapor Line Wall Ductwork Isolator Line Set Section 7 Refrigerant L...

Страница 10: ...orrect direction of refrigeration flow away from outdoor unit and toward evapo rator coil as illustrated Braze the filter drier to the Liquid Line Continue the dry nitrogen purge Do not remove the wet...

Страница 11: ...2 Check for leaks by using a soapy solu tion or bubbles at each brazed location Remove nitrogren pressure and repair any leaks before continuing Section 8 Refrigerant Line Leak Check 8 1 Check For Le...

Страница 12: ...ete blank off the vacuum pump and micron gauge and close the valves on the manifold gauge set 1 MIN Section 10 Service Valves 10 1 Open the Gas Service Valve 0350 Microns ON OFF CAP 1 4 TURN ONLY COUN...

Страница 13: ...System Service Port 3 16 Hex Wrench Unit Side of Service Valve Extreme caution should be exercised when opening the Liquid Line Service Valve Turn counterclockwise until the valve stem just touches t...

Страница 14: ...le stages of electric heat jumper W1 and W2 together if comfort control has only one stage of heat TEM6 only When using a BK enabled comfort control cut BK jumper and bypass Y1 and Y2 at the air handl...

Страница 15: ...ies Furnace NOTES 1 For PWM BK enabled thermostats cut the BK jumper on the IFC and connect wiring 2 The factory Y1 O jumper must remain in place for proper LED read out in cooling mode 3 Y1 and Y2 wi...

Страница 16: ...s STEP 5 Set system thermostat to ON OFF DONE CANCEL ON OFF STEP 4 Wait one 1 hour before starting the unit if compressor crankcase heater acces sory is used and the Outdoor Ambient is below 70 F 60 M...

Страница 17: ...ent tempera ture is above 55 F For best results the indoor temperature should be kept between 70 F to 80 F STEP 1 Use the refrigerant line total length and lift measurements from Section 5 3 Total Lin...

Страница 18: ...CHARGING CHART CORRECTIONS TABLE FOR LINE LENGTH AND RISE Add 2 REFRIGERANT LINE LIFT FT 4 Ton AC 50 1 40 1 30 25 Use Design Subcooling 15 10 0 20 30 40 50 60 70 80 90 100 110 120 130 140 150 REFRIGE...

Страница 19: ...essure should be ap proximately 327 PSIG This is the shown as the intersection of the Final Subcooling column and the Liquid Temperature row Table 14 2 8 9 10 11 12 13 14 179 182 185 188 191 195 198 1...

Страница 20: ...R TEMPERATURE Degree F SUCTION PRESSURE PSIG OUTDOOR TEMPERATURE Degree F COOLING PERFORMANCE CAN BE CHECKED WHEN THE OUTDOOR TEMP IS ABOVE 65 DEG F TO CHECK COOLING PERFORMANCE SELECT THE PROPER INDO...

Страница 21: ...ured Suction Line Temp __________ F Liquid Gage Pressure __________ PSIG Suction Gage Pressure __________ PSIG Calculating Charge Using the Weigh In Method 1 Measure in feet the distance between the o...

Страница 22: ...btained with the namplate charge plus additional charge previously added STEP 5 Return to site for adjustment Important Return in the spring or summer to accurately charge the system in the cooling mo...

Страница 23: ...gainst the following list Final phases of this installation are the unit Operational and Checkout Procedures To obtain proper performance all units must be operated and charge adjustments made Importa...

Страница 24: ...A C T O R C O I L L O W V O L T A G E F U S E S T U C K C O M P R E S S O R I N E F F I C I E N T C O M P R E F U N D E R C H A R G E R E F O V E R C H A R G E E X C E S S I V E E V A P L O A D N O N...

Страница 25: ...18 AC95D1 5C EN 25...

Страница 26: ...AHRI Certified mark indicates Trane U S Inc participation in the AHRI Certification program For verification of individual certified products go to ahridirectory org Trane has a policy of continuous d...

Отзывы: