18-AC108D1-1D-EN
5
2.5 Coastal Considerations
STEP 2
- To remove the unit from the pallet,
remove tabs by cutting with a sharp tool.
Section 3. Unit Preparation
3.1 Prepare The Unit For Installation
STEP 1
- Check for damage and report prompt-
ly to the carrier any damage found to the unit.
Section 4. Setting the Unit
4.1 Pad Installation
When installing the unit on a support pad, such
as a concrete slab, consider the following:
• The pad should be at least 1” larger than the
unit on all sides.
• The pad must be separate from any structure.
• The pad must be level.
• The pad should be high enough above grade
to allow for drainage.
• The pad location must comply with National,
State, and Local codes.
For other applications refer to application guide.
If installed within one mile of salt water, including seacoasts and inland waterways, models without factory sup-
plied Seacoast Salt Shields require the addition of BAYSEAC001 (Seacoast Kit) at installation time.
Содержание 4TTA4
Страница 24: ...24 18 AC108D1 1D EN 3 5 4 Ton Units PRINTED FROM D158514P01 5 Ton Units PRINTED FROM D158515P01...
Страница 25: ...18 AC108D1 1D EN 25 Section 17 Wiring Diagrams 036A3 042A3 048A3 060A3 Models...
Страница 26: ...26 18 AC108D1 1D EN 036A3 042A3 048A3 060A3 Models...
Страница 27: ...18 AC108D1 1D EN 27 036A4 042A4 048A4 060A4 Models...
Страница 28: ...28 18 AC108D1 1D EN 036A4 042A4 048A4 060A4 Models...