CHECKOUT PROCEDURES

After installation has been completed, it is recommended that the Air Handler be checked against the following 
checklist.

1.Make  sure  power  is  “OFF”  at  power  disconnect 
switch .......................................................................... [  ]
2.Check all field wiring for tight connections. See that 
grounding of unit is in accord with code ................... [  ]
3.Make  sure  unit  suspension  (if  used)  is  secure  and 
that there are no tools or loose debris in, around or on 
top of the unit ............................................................. [  ]
4.Check all duct outlets; they must be open and unre-
stricted ........................................................................ [  ]
5.Check drain lines and be sure all joints are tight . [  ]

6.Make sure secondary drain pan is installed .......... [  ]
7.Check  power  supply  for  correct  requirements  
per unit nameplate ..................................................... [  ]
8.Check filters for proper size. Inform owner of proper 
procedure for removal and reinstallation ................. [  ]
9.Energize the system and carefully observe its opera-
tion; make any necessary adjustment....................... [  ]
10.Instruct  owner,  engineer  (if  possible)  on  proper  
operating  procedure  and  leave  Use  and  Care  Manual 
with owner .................................................................. [  ]

SUPPLEMENTARY HEATERS CHECKOUT PROCEDURES  

IF a heater is USED, see "limitations and recommendations" 

to determine if the heater requires a SPECIAL CIRCUIT.

 

1.  Be sure the disconnect switch is “OFF”, and safety label (if any) is attached ............................ [  ]

 

2.  Check on field wiring for tight connections and grounding according to codes .......................... [  ]

 

3.  Check circuit protection for proper size per nameplate specifications ........................................ [  ]

 

4.  Check control box panel — in place and secured .......................................................................... [  ]

NOTE:

OPERATION OF HEATERS MUST BE CHECKED DURING THE OPERATIONAL CHECK OF THE TOTAL SYSTEM. 

I.   CHECKOUT PROCEDURE

1.  Check the Air Handler installation in accordance with this instruction.
2.  “Operational Procedure” for the system installation can be found in the outdoor unit installer guide and will be 
 

compatible with this Air Handler.

Содержание 4TGB3F18A

Страница 1: ...only Refer to Section B beginning on page 2 for additional information INSPECTION Check carefully for any shipping damage This must be reported to and claims made against the transporta tion company i...

Страница 2: ...s are suitable for instal lation in an attic garage or crawl space with ducted supply and return air This equipment for models 2 4TGB3F18 25 30 36A only has been evaluated in accordance with the Code...

Страница 3: ...NOTE TXV Equipped is Non Bleed and may require a start kit on the outdoor unit NOTE Refrigerant line openings must be sealed along with field wiring E BRAZING TO EVAPORATOR SECTION IMPORTANT Do not un...

Страница 4: ...are shipped with the accessory 4 Wiring must conform to National and Local codes Ground unit per Local codes with good safety pro cedures If an electric heater is not installed the Knockout Plate prov...

Страница 5: ...18 GD06D1 5 5 Installer s Guide 2 4TGB AIR HANDLERS WITH SINGLE STAGE COOLING 1 STAGE HEAT...

Страница 6: ...6 18 GD06D1 5 Installer s Guide 2 4TGB AIR HANDLERS WITH SINGLE STAGE COOLING AND TWO STAGE HEATING 2 4TGB AIR HANDLERS WITH SINGLE SPEED HEAT PUMP From Dwg B801081 Rev 2...

Страница 7: ...18 GD06D1 5 7 Installer s Guide OUTLINE DRAWING FOR 2 4TGB3F18 25 30 36A From Drawing D810094P01 Rev 3...

Страница 8: ...ts per unit nameplate 8 Check filters for proper size Inform owner of proper procedure for removal and reinstallation 9 Energize the system and carefully observe its opera tion make any necessary adju...

Отзывы: