background image

4

18-EB30D1-1G-EN

Introduction

Read this manual carefully before attempting to install,
operate, or perform maintenance on this unit.
Installation and maintenance should be performed by
qualified service technicians only. This unit is listed by
Underwriters Laboratory.

Packaged units are designed for outdoor mounting
with a vertical condenser discharge. They can be
located either at ground level or on a roof in
accordance with local codes. Each unit contains an
operating charge of refrigerant as shipped.

Extreme mounting kits are available for slab
(BAYEXMK003A), utility curb (BAYEXMK002B) and
perimeter curb (BAYEXMK001A) mountings.

This guide is organized as follows:

Step 1 — Inspect Shipment

Step 2 — Determine Unit Clearances

Step 3 — Review Location & Recommendation
Information

Step 4 — Unit Installation

Step 5 — Unit Startup

Sequence of Operation

Maintenance

S

Stte

ep

p 1

1 —

— IIn

nssp

pe

ecctt S

Sh

hiip

pm

me

en

ntt

1. Check for damage after the unit is unloaded. Report

promptly to the carrier any damage found to the
unit. Do not drop the unit.

IIm

mp

po

orrtta

an

ntt:: To prevent damage to the sides and top of

the unit when hoisting, use “spreader
bars”.

2. Check the unit’s nameplate to determine if the unit

is correct for the intended application. The power
supply must be adequate for both the unit and all
accessories.

3. Check to be sure the refrigerant charge has been

retained during shipment. Remove the Compressor
access panel to access the 1/4" flare pressure taps.

4. If this unit is being installed on a curb, verify that

the correct curb is provided with the unit.

4TCC4024–036 use model BAYCURB050A,
4TCC4042–060 use model BAYCURB051A

5. If the unit is being hoisted, accessory kit

BAYLIFT002A is recommended. It includes a kit of
four (4) lifting lugs and instructions.

N

No

otte

e:: If practical, install any internal accessories to the

unit at the shop.

N

No

otte

e:: The packaged units have been evaluated in

accordance with the Code of Federal Regulations,
Chapter XX, Part 3280 or the equivalent.

“SUITABLE FOR MOBILE HOME USE.”

Содержание 4TCC4024A1000A

Страница 1: ...alified person could result in death or serious injury When working on the equipment observe all precautions in the literature and on the tags stickers and labels that are attached to the equipment Ju...

Страница 2: ...tr ri ic ca al l c cu ur rr re en nt t a ar re e g gr ro ou un nd de ed d I If f g gr ro ou un nd di in ng g w wi ir re es s s sc cr re ew ws s s st tr ra ap ps s c cl li ip ps s n nu ut ts s o or r w...

Страница 3: ...Step 2 Determine Unit Clearances 5 Step 3 Review Location and Recommendation Information 11 Step 4 Unit Installation 12 Step 5 Unit Startup 21 Sequence of Operation 22 Maintenance 23 Important Product...

Страница 4: ...t 1 Check for damage after the unit is unloaded Report promptly to the carrier any damage found to the unit Do not drop the unit I Im mp po or rt ta an nt t To prevent damage to the sides and top of t...

Страница 5: ...18 EB30D1 1G EN 5 Step 2 Determine Unit Clearances Figure 1 2 3 TON MODELS Note The view labeled Bottom Side represents the base as viewed looking up from underneath the unit...

Страница 6: ...43 1 95 204 8 451 171 1 377 406 5 16 0 594 1 23 4 4TCC4036 61 7 136 38 9 86 27 7 61 43 7 96 205 7 453 172 0 379 414 3 16 3 697 6 27 5 4WCC4024 52 9 117 33 3 73 24 1 53 38 3 84 182 3 402 148 6 328 430...

Страница 7: ...18 EB30D1 1G EN 7 Figure 3 2 3 TON MODELS S St te ep p 2 2 D De et te er rm mi in ne e U Un ni it t C Cl le ea ar ra an nc ce es s...

Страница 8: ...N Figure 4 3 5 5 TON MODELS Note The view labeled Bottom Side represents the base as viewed looking up from underneath the unit S St te ep p 2 2 D De et te er rm mi in ne e U Un ni it t C Cl le ea ar...

Страница 9: ...54 4 120 252 6 557 205 4 453 433 0 17 0 743 3 29 3 4TCC4060 78 0 172 46 3 102 34 9 77 59 0 130 265 8 586 218 6 482 414 0 16 3 635 0 25 0 4WCC4042 64 4 142 47 6 105 39 5 87 49 9 110 248 6 547 9 201 4 4...

Страница 10: ...10 18 EB30D1 1G EN Figure 6 3 5 5 TON MODELS S St te ep p 2 2 D De et te er rm mi in ne e U Un ni it t C Cl le ea ar ra an nc ce es s...

Страница 11: ...nstruction on converting the supply and return airflow covers to down airflow 3 The field assembled Roof Mounting Curb BAYCURB050A or BAYCURB051A or a field fabricated curb should be in place before t...

Страница 12: ...the unit to direct roof water runoff 6 Seal all holes through exterior walls in accordance with local codes 7 Continue with the following installation sections to complete the installation Ductwork F...

Страница 13: ...on during lifting Always test lift the unit to determine the exact unit balance and stability before hoisting it to the installation location 4 When the curb and air ducts have been properly installed...

Страница 14: ...with local codes 11 Access and service clearances for the unit must be given careful consideration when locating the duct entrance openings Figures 1 to 6 provide unit dimensions 12 Continue with the...

Страница 15: ...V SUHSDUHG E WKH PDQXIDFWXUHU LQ RUGHU WR SURYLGH GHWDLO UHJDUGLQJ MRE OD RXW RQO 7KLV GUDZLQJ LV QRW LQWHQGHG WR EH XVHG DV D EDVLV WR FRQVWUXFW EXLOG RU PRGLI WKH LWHP GHSLFWHG LQ WKH GUDZLQJ 7KH PD...

Страница 16: ...port Center Support required on all frame applications Angle Iron Frame Table 5 Typical Rooftop Down Airflow Application with Frame Return Air Roof Flashing Channel Iron Center Support center support...

Страница 17: ...rproofed between the unit and the building When attaching ductwork to a horizontal unit provide a flexible watertight connection to prevent noise transmission from the unit to the ducts The flexible c...

Страница 18: ...hi in n s si ig gh ht t o of f t th he e u un ni it t If disconnect must be mounted to the cabinet the location shown in Table 9 p 18 should be the only one considered O Ov ve er r C Cu ur rr re en n...

Страница 19: ...RS FIELD INSTALLED JUMPERS 756977i2 FIELD PROVIDED FIELD CONNECTED WIRED UNIT HEATER AREA UNIT CONTROL BOX ELECTRIC HEATER CONTROL BOX HEATER FUSES UNIT FUSES GROUND WIRE UNIT LOW VOLTAGE AREA UNIT LO...

Страница 20: ...completion of wiring check all electrical connections including factory wiring within the unit and make sure all connections are tight Replace and secure all electrical box covers and access panels b...

Страница 21: ...e used in the A AU UT TO O mode O Op pe er ra at ti in ng g P Pr re es ss su ur re e C Ch he ec ck ks s After the unit has operated in the cooling mode for a short period of time install pressure gaug...

Страница 22: ...ought on when the indoor temperature drops 1 1 2 degrees below the thermostat setting T TS SH H 2 2 contacts close providing power to the W W terminal on the indoor thermostat and to the supplementary...

Страница 23: ...ters of the same type and size D Do o n no ot t a at tt te em mp pt t t to o c cl le ea an n d di is sp po os sa ab bl le e f fi il lt te er rs s Permanent type filters can be cleaned by washing them...

Страница 24: ...BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 6HUYLFH QIRUPDWLRQ DOO RXU LQVWDOOLQJ GHDOHU LI WKH XQLW LV LQRSHUDWLYH HIRUH RX FDOO DOZD V FKHFN WKH IROORZLQJ WR EH VXUH VHUYLFH LV UHTXL...

Страница 25: ...18 EB30D1 1G EN 25 N No ot te es s...

Страница 26: ...26 18 EB30D1 1G EN N No ot te es s...

Страница 27: ...18 EB30D1 1G EN 27 N No ot te es s...

Страница 28: ...com The AHRI Certified mark indicates company participation in the AHRI Certification program For verification of individual certified products go to ahridirectory org The manufacturer has a policy o...

Отзывы: