3. The support pad must NOT be in direct contact with

any structure. Unit must be positioned a minimum of
12" from any wall or surrounding shrubbery to insure
adequate airflow. Clearance must be provided in front of
control box (access panels) and any other side requiring
service access to meet National Electrical Code. Also, the
unit location must be far enough away from any struc-
ture to prevent excess roof run-off water from pouring
directly on the unit. Do not locate unit(s) close to
bedroom(s).

4. The top discharge area must be unrestricted for at least

five (5) feet above the unit.

5. When the outdoor unit is mounted on a roof, be sure the

roof will support the unit’s weight. Properly selected
isolation is recommended to prevent transmission to the
building structure.

6. The maximum length of refrigerant lines from outdoor to

indoor unit should NOT exceed eighty (80) feet.

7. If outdoor unit is mounted above the air handler, maxi-

mum lift should not exceed twenty-five (25) feet (suction
line). If air handler is mounted above condensing unit,
maximum lift should not exceed twenty-five (25) feet
(liquid line).

8. Locate and install indoor coil or air handler in accor-

dance with instruction included with that unit.

C. INSTALLING REFRIGERANT LINES

CAUTION

!

If using existing refrigerant lines make certain that all joints
are brazed, not soldered.

Condensing units have provisions for braze connections.

Pressure taps are provided on the service valves of outdoor
unit for compressor suction and liquid pressures.

The indoor end of the recommended refrigerant line sets may
be straight or with a 90 degree bend, depending upon
situation requirements. This should be thoroughly checked
out before ordering refrigerant line sets.

The gas line must always be insulated.

The units are factory charged with the system charge required
when using fifteen (15) feet of connecting line. Unit nameplate
charge is the same.

Final refrigerant charge adjustment is necessary. Use
the Charging Charts in the outdoor unit Service Facts.

1. Determine the most practical way to run the lines.

2. Consider types of bends to be made and space limitations.

NOTE:
Large diameter tubing will be very difficult to rebend once it
has been shaped.

3. Determine the best starting point for routing the refriger-

ant tubing — INSIDE OR OUTSIDE THE STRUCTURE.

4. Provide a pull-thru hole of sufficient size to allow both

liquid and gas lines.

5. Be sure the tubing is of sufficient length.

6. Uncoil the tubing — do not kink or dent.

7. Route the tubing making all required bends and properly

secure the tubing before making connections.

8. To prevent a noise within the building structure due to

vibration transmission from the refrigerant lines, the
following precautions should be taken:

a. When the refrigerant lines have to be fastened to floor

joists or other framing in a structure, use isolation
type hangers.

b. Isolation hangers should also be used when refriger-

ant lines are run in stud spaces or enclosed ceilings.

c. Where the refrigerant lines run through a wall or sill,

they should be insulated and isolated.

d. Isolate the lines from all ductwork.

D. SERVICE VALVE OPERATION

BRASS LIQUID LINE SERVICE VALVE

The Brass Liquid Line Service Valve is factory shipped in the
seated position to hold factory charge. The pressure tap service
port (when depressed) opens only to the field brazing side of
the valve when the valve is in the seated position. The liquid
line valve is not a back seating valve (see WARNING below).

WARNING

!

Extreme caution should be exercised when opening the
Liquid Line Service Valve. Turn valve stem counterclock-
wise only until the stem contacts the rolled edge. (See
Figure 3) No torque is required.

BRASS GAS LINE BALL SERVICE VALVE

The Brass Gas Line Service Valve is shipped in the closed
position to hold the factory refrigerant charge. The pressure
tap service port (when depressed) opens only to the field
brazing side when the valve is in the closed position.

The Gas Line Service Valve is full open with a 1/4 turn. See
Figure 4.

BASEPAN TAB REMOVAL

2

LIQUID LINE SERVICE VALVE

3

Содержание 2TWZ9

Страница 1: ...istributor A GENERAL The following instructions cover 2TWZ9 Heat Pump Units NOTE These outdoor units must be used with indoor units equipped with Thermostatic Expansion Valve only Check for transporta...

Страница 2: ...is the same Final refrigerant charge adjustment is necessary Use the Charging Charts in the outdoor unit Service Facts 1 Determine the most practical way to run the lines 2 Consider types of bends to...

Страница 3: ...pressure taps NOTE Unnecessary switching of hoses can be avoided and com plete evacuation of all lines leading to sealed system can be accomplished with manifold center hose and connecting branch hos...

Страница 4: ...rement is representative of the operating state and relative capacity of the heat pump system By measuring the change in delta T we can determine the need for defrost The coil sensor also serves to se...

Страница 5: ...f this installation are the unit Operational and Checkout Procedures which are found in this instruction on page 8 To obtain proper performance all units must be operated and charge adjustments made i...

Страница 6: ...46 37 1 4 870 34 1 4 7 8 3 8 152 6 98 3 7 8 219 8 5 8 86 3 3 8 933 36 3 4 2TWZ9036B 4 1267 49 7 8 946 37 1 4 870 34 1 4 7 8 3 8 152 6 98 3 7 8 219 8 5 8 86 3 3 8 933 36 3 4 2TWZ9048B 4 1267 49 7 8 946...

Страница 7: ...18 BC53D1 2 7 Installer s Guide MOUNTING HOLE LOCATION NOTE ALL DIMENSIONS ARE IN MM INCHES NOTE For model base size see table on page 6 From Dwg 21D152637 Rev 1...

Страница 8: ...Inadequate or No Cooling Htg ELECTRICAL Compressor O D Fan Won t Start Compressor Will Not Start But O D Fan Runs O D Fan Won t Start Compressor Hums But Won t Start Compressor Cycles on IOL I D Blow...

Отзывы: