TRAK Machine Tools
Site Preparation Guide TRAK VMC12si
F16467-64 | Rev 9/10/2021
Page 2 of 7
Figure 1
–
Front View of Machine
Figure 2
Side View of Machine
Страница 1: ...ion and service manual for additional information Make sure to follow our grounding recommendations The machine must have air hooked up We strongly recommend that a water separator or air dryer be installed upstream of the VMCsi air supply Space Weight Floor area W x L 203 x 157 Height 106 min 119 25 max Footprint W x L coolant tank in place 168 25 x 126 50 Net approx Weight 15 400 lbs Shipping ap...
Страница 2: ...TRAK Machine Tools Site Preparation Guide TRAK VMC12si F16467 64 Rev 9 10 2021 Page 2 of 7 Figure 1 Front View of Machine Figure 2 Side View of Machine ...
Страница 3: ...TRAK Machine Tools Site Preparation Guide TRAK VMC12si F16467 64 Rev 9 10 2021 Page 3 of 7 Figure 3 Top View of Machine Figure 4 Lifting the VMCsi ...
Страница 4: ...TRAK Machine Tools Site Preparation Guide TRAK VMC12si F16467 64 Rev 9 10 2021 Page 4 of 7 Figure 5 Lifting the VMCsi Figure 6 Leveling Pad Locations ...
Страница 5: ...of 7 If you would like to lift the machine with a crane the following figures show the lifting points Note Brackets that attach to the two column casting and shown in figure 8 are not provided with the machine Figure 7 Lifting Machine with Straps Figure 8 Lifting Machine on Top of Column ...
Страница 6: ... the figure 10 Figure 9 Connect the Ground Wire Machine Grounding It is strongly recommended that the machine be earth grounded A dedicated copper rod 8 feet or so in length should be driven into the ground near the VMCsi A ground wire should then be run from the location shown in figure 9 The copper wire should exit the electrical cabinet in the mid left hand side as shown in figure 10 Make sure ...
Страница 7: ...TRAK Machine Tools Site Preparation Guide TRAK VMC12si F16467 64 Rev 9 10 2021 Page 7 of 7 Figure 10 Exit Location for Ground Wire to Copper Rod ...