Figure 10
–
Exit Location for Ground Wire to Copper Rod
Страница 1: ...up We strongly recommend that a water separator or air dryer be installed upstream of the TMC air supply Space Weight Floor area W x L 174 50 x 135 Height 90 min 106 5 max Footprint W x L coolant tank...
Страница 2: ...TRAK Machine Tools Site Preparation Guide TRAK TMC10 F16467 55 Rev 8 25 2021 Page 2 of 7 Figure 1 Front View of Machine Figure 2 Side View of Machine...
Страница 3: ...TRAK Machine Tools Site Preparation Guide TRAK TMC10 F16467 55 Rev 8 25 2021 Page 3 of 7 Figure 3 Lifting the TMC Figure 4 Lifting the TMC...
Страница 4: ...TRAK Machine Tools Site Preparation Guide TRAK TMC10 F16467 55 Rev 8 25 2021 Page 4 of 7 Figure 5 Lifting the TMC Figure 6 Leveling Pad Locations...
Страница 5: ...7 If you would like to lift the machine with a crane the following figures show the lifting points Note Brackets that attach to the two column casting and shown in figure 8 are not provided with the...
Страница 6: ...e figure 9 Figure 9 Connect the Ground Wire Machine Grounding It is strongly recommended that the machine be earth grounded A dedicated copper rod 8 feet or so in length should be driven into the grou...
Страница 7: ...TRAK Machine Tools Site Preparation Guide TRAK TMC10 F16467 55 Rev 8 25 2021 Page 7 of 7 Figure 10 Exit Location for Ground Wire to Copper Rod...