![TrafFix Scorpion II METRO TL-2 PLUS Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/traffix/scorpion-ii-metro-tl-2-plus/scorpion-ii-metro-tl-2-plus_assembly-manual-and-mounting-instruction-manual_1148301032.webp)
P/N 13089 Rev A1 Dated 5/13/2020 28
5. After proper confirmation of the backing plate being level and 90° to the horizontal surface, deploy the drops jacks
and unbolt the TMA from the backing plate that is already tacked onto the host vehicle. Fully weld the backing plate on
both the inside and outside of the frame rails. Proper welding locations are specified in the figure below:
6. Position the 9” x 4” vertical angles with C
-
clamps on to the side of the frame as shown in first figure (bottom left). No-
tice there is a left and right side vertical angle and the flanges should be positioned toward the rear of the truck. Four
holes are located in the angle for bolting to the frame (refer to middle figure).
Center the holes vertically on the frame
and drill/burn 4 holes in the frame on both sides. Also, drill/burn 2 holes on the angle to align with the outermost holes
of the backing plate as shown in the middle figure as well. Bolt the vertical angles onto the frame with the 1” bolts as
shown in the last figure (bottom right).
Содержание Scorpion II METRO TL-2 PLUS
Страница 2: ...P N 13089 Rev A1 Dated 5 13 2020 i This Page is Intentionally Left Blank ...
Страница 9: ...P N 13089 Rev A1 Dated 5 13 2020 5 Notes ...
Страница 10: ...P N 13089 Rev A1 Dated 5 13 2020 6 Scorpion II Metro TL 2 Plus Major Components ...
Страница 12: ...P N 13089 Rev A1 Dated 5 13 2020 8 Assembly of Scorpion II Metro TMA ...
Страница 25: ...P N 13089 Rev A1 Dated 5 13 2020 21 Complete Assembly of Metro TMA Module E Module C Module A ...
Страница 29: ...P N 13089 Rev A1 Dated 5 13 2020 25 GROUND LEVEL GROUND LEVEL ...
Страница 45: ...P N 13089 Rev A1 Dated 5 13 2020 41 Scorpion II Metro TMA High Pivot ...
Страница 46: ...P N 13089 Rev A1 Dated 5 13 2020 42 ...
Страница 47: ...P N 13089 Rev A1 Dated 5 13 2020 43 ...
Страница 48: ...P N 13089 Rev A1 Dated 5 13 2020 44 ...
Страница 49: ...P N 13089 Rev A1 Dated 5 13 2020 45 Scorpion II Metro TMA Low Pivot ...
Страница 50: ...P N 13089 Rev A1 Dated 5 13 2020 46 ...
Страница 51: ...P N 13089 Rev A1 Dated 5 13 2020 47 ...
Страница 52: ...P N 13089 Rev A1 Dated 5 13 2020 48 ...
Страница 54: ...P N 13089 Rev A1 Dated 5 13 2020 50 Distributed By ...