![Trace2O ARSENOMETER HMAS100 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/trace2o/arsenometer-hmas100/arsenometer-hmas100_instruction-manual_1146879017.webp)
17
Arsenometer HMAS100
Instruction Manual v2.0
2.3. OPERATING PROCEDURE
2.3.1. METHODS
The Arsenometer operating procedure consists of two main steps
– plating
(conditioning) and analysis. The plating step forms a plate on the surface of the
working electrode which can be seen as a yellow/gold layer on the tip of the Working
Electrode. The quality of this plate is essential to achieving reliable
results.