ISSUE DATE 12-12-08 REV. DATE 12-12-08 REV. LEVEL: 01 ECN: GP-5179 OIPM P/N 3420466 PG
9
OF
20
4. Position the rubber gasket (item 18) and the
base (item 21) on the bottom of the terminal
box (item 7), aligning the slotted holes.
Fasten the base and terminal box together
with the screws and nuts (items 16 & 17)
provided. (See page 14 (FHK-2) or 15 (FHK-
4) for item number list.)
5. Screw handle (item 22) onto the 3/8” bolt on
the back of the housing.
6. Connect heater to a suitable electric circuit.
Note: Handle, gasket, bolts, and nuts are in
hardware package 3917900.
INSTALLATION – WIRING (cont.)
22
Base and handle
Assembly view
7
21
17
18
16