TPE ZEVAC Скачать руководство пользователя страница 7

 

CHECK BEFORE OPERATION 

Air Supply 

DANGER

 

Follow Lock-out / Tag-out (LOTO) procedures for all process and energy connections. 

 

WARNING

 

All air supply system components must be rated for the service conditions present. 

Step  Check Description 

 

Air supply is capable of supplying adequate air volume (at least 90cfm per unit) 

 

Air supply is capable of supplying adequate air pressure (at least 100 psig) 

 

Air supply is connected to ZEVAC in a secure fashion 

 

Air supply connection piping / hoses have been verified to be leak-free 

 

Air regulator is set to deliver adequate pressure to ZEVAC (100 

 250 psi) 

 

VERIFY Hose halters are in place on all hose connections 

 

 

Inlet Connection 

DANGER

 

Follow Lock-out / Tag-out (LOTO) procedures for all process and energy connections. 

 

WARNING

 

All gas system components must be rated for the service conditions present. 

Step  Check Description 

 

Identify inlet gas connection 

 

Verify inlet gas connection has isolation valve 

 

Inlet Gas Connection is connected to ZEVAC in a secure fashion 

 

Inlet Gas piping / hoses have been verified to be leak-free 

 

Inlet Gas piping has an isolation valve 

 

Verify hose halters are in place on ZEVAC  inlet gas hose. 

 

 

Discharge Connection 

DANGER

 

Follow Lock-out / Tag-out (LOTO) procedures for all process and energy connections. 

 

WARNING

 

All gas system components must be rated for the service conditions present. 

Step  Check Description 

 

Identify discharge gas connection 

 

Содержание ZEVAC

Страница 1: ...SAFETY OPERATION MAINTENANCE AND STORAGE OF THIS PRODUCT BEFORE USE READ CAREFULLY AND UNDERSTAND ALL CAUTIONS WARNINGS INSTRUCTIONS AND PRODUCT LABELS FAILURE TO DO SO COULD RESULT IN SERIOUS PERSONA...

Страница 2: ...roduced without written permission Keep this owner s manual handy so you can refer to it at any time The illustrations and procedures may vary according to the type If a problem should arise or if you...

Страница 3: ...hout the approval of an authorized TPE representative CAUTION You must observe the instructions contained in this manual Failure to do so could result in physical injury damage or delays It is extreme...

Страница 4: ...within the work area Hard hat Flame Retardant Clothing FRC Safety goggles preferably with side shields Protective shoes Protective gloves Hearing protection First aid kit NOTICE Never operate a unit...

Страница 5: ...he maximum air pressure delivered to the ZEVAC Regulator contains a 5 8 Lock Nut and requires significant user effort to adjust wrenches at a minimum Air Control Valve Pilot Reset Manual Valve Pneumat...

Страница 6: ...ck In the event that the gas suction pressure drops below the set point this control valve will prevent the ZEVAC from continuing to actuate Indicator Form Function Air Supply Pressure Panel Gauge Dis...

Страница 7: ...ters are in place on all hose connections Inlet Connection DANGER Follow Lock out Tag out LOTO procedures for all process and energy connections WARNING All gas system components must be rated for the...

Страница 8: ...ify all safety controls are in place and properly connected STARTUP Pre Startup Purge First Startup In order to avoid the mixture of air and flammable gases it is required to purge the ZEVAC of air be...

Страница 9: ...tion 8 Verify smooth and normal ZEVAC Operation 9 Always monitor ZEVAC during operation OPERATION Step Check Description 1 Verify Gas Inlet pressure is dropping 2 Verify Gas Discharge pressure is not...

Страница 10: ...using a crane Use only lifting equipment of suitable capacity for the size and weight of the lifted equipment The equipment must always be lifted using safe working practices and in accordance with an...

Страница 11: ...erational and maintenance steps are complete After connecting the trailer to the tow vehicle check that the hitch assembly is latched Verify that the rear and tongue jacks are raised after the trailer...

Страница 12: ...nly Ex approved spare parts and accessories that are authorized by an Ex approved TPE representative are used in Ex approved products Limitations The warranty does NOT cover defects that are caused by...

Страница 13: ...position As the ZEVAC is evacuating gas the valve is allowing gas to enter the drawdown system and the pressure may not drop or may reduce more slowly than normal If the ZEVAC seems to be operating no...

Страница 14: ...mporary condition Any sudden Bang or the non intermittent sound of gas being released is an indicator of an abnormal operating condition Follow SHUTDOWN procedure and call 1 855 ZEVAC GO for support a...

Страница 15: ...to the device In the event that the ZEVAC unit cannot be accessed and needs to be shut down turn off the air supply 5 Always turn off the unit when making adjustments or changing connections 6 Inspect...

Отзывы: