
2.
If the unit was secured to a pallet, flatbed or other surface, cut the transportation straps.
3.
Align the forklift prongs with the forklift holes in the bottom of the ZEVAC® base.
4.
Insert the forklift prongs into the forklift holes.
5.
Lift the unit and move it to its new position.
6.
Place the ZEVAC® upright on a rigid horizontal surface so that it cannot fall over.
Towing
Read the trailer operation manual before connection of the trailer to the tow vehicle.
• Follow all highway laws that pertain to the tow vehicle and the trailer in your region.
• Use the proper sized tow vehicle for the load of the trailer.
• Ensure the trailer is operational and maintenance steps are complete.
• After connecting the
trailer to the tow vehicle, check that the hitch assembly is latched.
• Verify that the rear and tongue jacks are raised after the trailer is attached to the tow vehicle.
Storage
The product must be stored in a covered and dry location free from heat, dirt, and vibrations.
Protect the product against humidity, heat sources, and mechanical damage.
NOTICE
Do not expose an idle unit to freezing conditions. Drain all liquid that is inside the unit and connected
pipes. Failure to do so can cause liquid to freeze and damage the unit.
Empty the ZEVAC® of all product and clean surfaces of dirt, debris, oil, fuel, and associated
matter.
COLD WEATHER OPERATIONS
In cold weather ambient conditions, it may be necessary to warm the system to temperatures
above freezing prior to startup.