![TPC Mirage 2.0 Hydraulic Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/tpc/mirage-2-0-hydraulic/mirage-2-0-hydraulic_installation-operation-user-manual_1146131018.webp)
18
www.tpcdental.com
Operating Speed Controls
Operating speeds are preset at factory but can be changed if desired.
•
TV1 = Base up flow control
•
TV2 = Base down Flow Control
•
TV3 = Back up flow control
•
TV4 = Back down flow control
When adjusting the flow control valves counterclockwise turns will open / increase flow.
Turning the valve clockwise will close the valve and decrease the flow.
Don’t open or close a flow control valve completely. Its best to adjust in quarter turn rotations
only.
Содержание Mirage 2.0 Hydraulic
Страница 17: ...17 www tpcdental com Wiring schematic...