3-1
C
HAPTER
3
I
NSTALLING
THE
S
WITCH
Selecting a Site
Switch units can be mounted in a standard 19-inch equipment rack or on a
flat surface. Be sure to follow the guidelines below when choosing a
location.
•
The site should:
-
be at the center of all the devices you want to link and near a
power outlet.
-
be able to maintain its temperature within 0 to 40 °C (32 to
104 °F) and its humidity within 10% to 90%, non-condensing
-
provide adequate space (approximately two inches) on all sides for
proper air flow
-
be accessible for installing, cabling and maintaining the devices
-
allow the status LEDs to be clearly visible
•
Make sure twisted-pair cable is always routed away from power lines,
fluorescent lighting fixtures and other sources of electrical
interference, such as radios and transmitters.
•
Make sure that the unit is connected to a separate grounded power
outlet that provides 100 to 240 VAC, 50 to 60 Hz, is within 2.44 m
(8 feet) of each device and is powered from an independent circuit
breaker. As with any equipment, using a filter or surge suppressor is
recommended.
Содержание TL-SL5428
Страница 1: ...Installation Guide TL SL5428 24 Port 10 100 4 Port Gigabit Managed Switch Rev 1 0 1...
Страница 5: ...TABLE OF CONTENTS iii Standards C 3 Compliances C 3 Glossary Index...
Страница 6: ...TABLE OF CONTENTS iv...
Страница 8: ...vi...
Страница 10: ...FIGURES viii...
Страница 18: ...ABOUT THE TL SL5428 1 8...
Страница 34: ...INSTALLING THE SWITCH 3 10...
Страница 54: ...SPECIFICATIONS C 4 Immunity EN 61000 4 2 3 4 5 6 8 11 Safety CSA CSA 22 2 NO60950 1 CB IEC 60950 1...
Страница 60: ...Glossary 6...
Страница 64: ...TP LINK TECHNOLOGIES CO LTD http www tp link com 7106503136...