4.2 TMS (TOYOTA MONITORING SYSTEM)
99
4.2
TMS (TOYOTA MONITORING SYSTEM)
You can use our TMS (TOYOTA MONITORING SYSTEM) and other network applications (optional)
by connecting the JAT710 Air Jet Loom to the network.
You are requested to provide your own network piping, wiring-related equipment, computer arrange-
ment and construction work on your account.
4.2.1
Scope of your work
•
Designation of TMS options of JAT710
Since the network board and software CD-ROM exclusively for JAT710 are necessary, lease
inform Toyota of these TMS options when determining the JAT710 specifications.
•
Network design based on JAT710 connection study diagram
Study the JAT710 connection method by entering the wiring route in the plant layout drawing.
Please prepare the network design appropriate for your plant by referring to 4.2.3 “Network
Design” and determine the required cable length as well as the quantities and installing positions
of switching hubs and routers.
•
Network construction
Network cables should be laid under the plant floor with protecting metal conduits for prevention
of noise and damage. The power supply (100 VAC or 200 VAC) for the line concentrators
(switching hubs) for network construction is also required. Please perform piping, network
cabling, and power supply equipment installation by referring to 4.2.4 “Piping Work”.
•
Preparation of equipment and materials
Please prepare the equipment and material listed in 1) to 5) below.
Determine the necessary quantities by referring to "4.2.3 5) Network Equipment Selection and
Ordering".
1) Computer
(Selection standards)
•
PC/AT compatible machine preinstalled with Microsoft Windows 2000 or Microsoft Windows XP
as the OS.
•
CPU: Frequency at or above 800 MHz
•
Memory: 256 MB or more
•
HDD: 2GB or more of HDD, C drive space
•
LAN: Ethernet port installed as network interface (compatible with 100BASE-TX or 10BASE-T)
•
Required peripherals: Display unit, keyboard, mouse, desk and chair
•
PC card drive: Type I or Type II x 1 slot
(TMS can be operated by data collection from the memory card during network down. This is not
mandatory.)
2) Software
•
Microsoft Internet Explorer version 5.5 or later
•
Microsoft Excel 2000 (or newer Microsoft Excel)
3) Switching hubs
(Selection standards)
•
All ports must be compatible with 100 BASE-TX/10BASE-T, full/half duplex communication.
•
At least 1,000 MAC address entries should be provided.
•
Built-in power supply (since the adapter type involves possible jack disconnection)
•
Desirably without a cooling fan (because the fan is likely to be broken)